The process of cost estimating is working out how much a building or other construction will cost to make. The costs are usually divided into materials and labor costs.
Tendering is the process of making a priced offer to construct the building. This is a legally enforcable offer made within the conditions of the tender documentation.
Building is a structure and civil in water, sewer, storm drains as well as roads and bridges.
The portland cement is used in general construction.The type-II cement is used in general concrete construction exposed to moderate sulphate action. i.e.,Concrete to be used in marine conditions.Concrete to be used in the construction of sewage treatment works.
difference between the manufacture of bricks and manufacture of tiles
Tender drawings are preliminary designs prepared to solicit bids from contractors, focusing on the overall layout, dimensions, and specifications necessary to provide an estimate for the project. In contrast, construction drawings are detailed and finalized documents used during the actual building process, including comprehensive information on materials, construction methods, and specific measurements. While tender drawings outline the project's intent, construction drawings provide the precise instructions needed for execution.
A construction joint in concrete jobs is a joint where a fully set and hard concrete joins a fresh concrete to make a joint. Normally, cracks would occur at this joint because concrete was not cast monolithic. A contraction joint is joint between two concrete edges so formed which allows minute movement between the two edges caused by heat or some other external forces. Usually, contraction joints are also referred to as expansion joints.
What is the difference between the construction of a moving coil galvanometer and a ballistic galvanometer?
sdsfdsf sdfsdfsfsd fsfsdfsdf sdfsdfsdfds
different molecular construction
How to construction a new house and materials
Bill of materials (BOM) is a list of the raw materials, sub-assemblies, intermediate assemblies, sub-components, components, parts and the quantities of each needed to manufacture a final product.Bill of quantities (BOQ) is a document used in tendering in the construction industry in which materials, parts, and labor and their costs are itemized.
I' m also finding the answer pf this question, by the way, are you from GAC center?
Strict construction takes a narrow view of laws, statutes, and the constitution. Broad construction takes a broad view of laws, statutes, and the constitution.
Activity duration estimating involves determining the amount of time an activity will take to complete, considering factors like resources, dependencies, and constraints. Estimating the effort required to perform an activity, on the other hand, focuses on quantifying the work or labor needed to complete the activity, taking into account skill levels, complexity, and potential risks. In essence, duration estimating is about time, while effort estimating is about the work involved.
Front end estimation is simpler but usually more crude.
The difference is that generally - but not always - in the construction "you have not" the word HAVE serves as an auxiliary, not as the main verb, whereas in the construction "you do not have" the word HAVE is always the main verb. For example You have not eaten your broccoli so you do not have a clean plate.
the construction is different, each have pros and cons
between 405 and 406.