There are no curing time requirement for prime coat.
You can asphalt rigth away after your prime as long as the prime have the proper temperature.
There are curing time for TACK COAT which is different. (TACK IS OVER ASPHALT,PRIME IS OVER BASE ROCK ).Is a common mistake confuse those two different operations.
The curing time for TACK depend of the weather and varie between 8 hrs to 24 hrs.
Gustavo Cuenca
Civil Engineer.
AR = RAR / RAC Where: AR = application or shot rate of undiluted prime RAR = specified residual application rate RAC = residual asphalt content of prime There is good agreement in the literature on application rates. The Asphalt Institute recommends application rates of 0.9 to 2.3 L/m2 (0.2 to 0.5 gal/yd2) for MC cutbacks and 0.5 to 1.4 L/m2 per 25 mm of depth (0.1 to 0.3 gal/yd2/in depth) for asphalt emulsions. Others recommend from 0.65 L/m2 to 2.0 L/m2 (0.15 to 0.45 gal/yd2) . Application rates should vary based on the openness of the base and no more prime should be placed than can be absorbed by the granular base in 24 hours. Any excess should be removed with blotter sand.
1. Ayala Land Inc. 2. Jollibee Foods Corp. 3. Ayala Corp. 4. Globe Telecom 5. San Miguel Corp. 6. Bank of the Philippine Islands 7. ABS-CBN Broadcasting Corp. 8. Philippine Long Distance Telephone Co. 9. SM Prime Holdings 10. Banco de Oro Unibank.
Generally it will be as project specification or as directed by the Engineer.
Longitude has a minimum of -180 (west of the prime meridian) and a maximum of 180 (east of the prime meridian). -180 and 180 are the same line, approached from opposite directions. 0 degrees of longitude runs through London, England and is called the "prime meridian."
There is a substantial amount of misinformation concerning the function and proper use of prime. Prime is not glue-causing the base to adhere to the pavement is not its purpose. Prime's purpose is to protect the base from rain and light traffic, when the paving will be delayed.A prime coat is an application of an asphalt cutback or emulsified asphalt to a prepared base. The base can be either a sub grade or a base rock. Prime functions as a protector from rain for both types of bases. A primecoat should not be confused with a tack coat. Tack is an a adhesive for gluing two asphalt layers together.
There is no limit for prime minister of Pakistan .
About 250 Missiles in Metroid Prime.
Two.
On May 26, 2014 Narendra Modi started his term as the 15th Prime Minister of India. Narendra Damodar Modi, 63, is India's 15th Prime Minister. Narendra Damodar Modi was sworn in on May 16th, 2014, after running on a platform promising minimum government but maximum governance.
36
25
prime a loop is that how mach time it executed either max time or minimum time
Of voting age, which is 18.
Gamma prime solvus is the the maximum amount of gamma prime that can dissolve at any given temperature up to the extent of the solidus line.