What is construction cost estimating?

Construction cost estimating is the process of determining the cost of materials and labor for constructing a buliding or other built object such as a dam. It is a skilled and difficult task and considerable experience is needed if an accurate estimate is needed. It would be prudent to use an architect or quantity surveyor to provide an estimate of construction costs for an expensive building. An example of how estimating is done is at the web link below. This clearly shows the difficulty of the task and how many variables must be taken into account.


What is the role of a quantity surveyor in the precontract phase of a building development?

Scrutinize, review of tender drawings/documents for discrepancies, additional BoQ items/scope and incorporating within the tender offer; Liaise with consultant regarding ambiguities contract work scope and seek clarifications there to. •Quantity Take Off for all Civil elements (manually, A-CAD) based on pricing preambles and compiling the Tender BoQ with description. •Analysis of rates for Labour, Material and Plant (fixed and variable) and thus assist build up costing, pricing and analysis of direct and indirect cost for the BOQ items. •Maintain vendors data base, Floating Enquiries to subcontractors and suppliers. •Analyze and compare quotations received at bid stage and clarifying exclusions/qualifications within. •Compilation of tender/bid offer submissions. •Any additional task assigned by superior / reporting head.


What does one beam cannot hold the roof up mean?

The phrase "one beam cannot hold the roof up" signifies that no single individual or element can bear the entire weight of a responsibility or task. It emphasizes the importance of teamwork, collaboration, and shared effort in achieving goals or supporting a structure. Just as a roof requires multiple beams for stability, successful endeavors often rely on contributions from various people or components working together.


What is the role of project management in construction for?

The role and job of project management in construction is for managing a construction project. Project management jobs help organize the construction and the people needed to make the construction.


Why steel is used to reinforce concrete?

Steel is used to reinforce concrete because it makes the concrete much stronger and helps it handle more pressure. Concrete is very good at withstanding heavy weight (compression), but it can easily crack or break when it is pulled or bent (tension). Steel, on the other side, is very strong in tension. Also, steel and concrete expand and contract at similar rates in heat and cold, so they stay bonded well over time. This combination makes reinforced concrete strong, durable, and safe for building structures like bridges, buildings, and roads.

Related Questions

When was Internet Engineering Task Force created?

Internet Engineering Task Force was created in 1986.


A network technician is required to provide access to the Internet for a large company?

Sort of. Access to the internet is provided by an ISP (internet service provider) and a network technician's job is 1. to determine if your business is able to access the internet and 2. connect the proper cables to provide access to the internet.


What is the real meaning of task?

A task is something you are required to do.


Which task must be completed first for a technician to be able to configure power management states using Windows XP?

Which task must be completed first for a technician to be able to configure power management states using Windows XP?


What type of information contain in ietf?

it stands for Internet Engineering Task Force


What is a word for a group of engineers joined together for a particular task?

Engineering Team.


What are the managing bodies of Internet?

Internet activities board - iabinternet research task force - irtf internet engineering task force - ietf


What is the minimum amount of work required to complete this task?

The minimum amount of work needed to finish this task.


What was the authors name of the Internet engineering task forces RFC document?

kallie goettsch


What is a typical task performed by a level one technician in a call center?

gathering information when a customer calls for help


Why do you need to precise your work as a technician?

The main purpose is to save time and cost so as a tehcnician to precise their task.


What are the advantages of using the design cycle?

Developing a software is not a easy task. It requires proper engineering or software engineering. To do the task efficiently design cycle is used that helps in carrying out the tasks in a systematic manner.