the minimum is 2 yards.
The term "yards" of concrete means cubic yards.
You will need 27.6 cubic yards of cement.
You will need 3.6 cubic yards.
40.1 cubic yards
3.95 cubic yards of cement are needed for a slab that size.
3880 cubic yards
Approximately 12.35 Cubic Yards.
How thick? Gotta have thickness to calculate cubic yards.
11.852 cubic yards
1.19 Cubic Yards
123.44 cubic yards
That depends on the length and width of your construction.