The average price per square foot for a warehouse in New Jersey is about $6.08. This means a 200,000 square foot warehouse would cost about $1,216,000.
14,500
You should expect to pay around 1000 dollars per month on this size of warehouse. A good rule of thumb to use is to budget for about 2 dollars per square foot annually.
The construction cost per square foot in Asheville, North Carolina is about $88 per square foot. This means a 3000 square foot building would cost about $264,000 to build.
The average construction cost per square foot in central Virginia is about $125. This means a 200 square foot building would cost about $25,000 to build.
The average construction cost per square foot in Fairfax County, Virginia is about $100 per square foot. this means a house of 800 square feet would cost about $80,000 to build.
Average price to scrub warehouse for with degreaser for double scrubbing would be approximately 18-22 cents per square foot
The average construction cost per square foot for a building addition in Ocean City, Maryland is about $130. This means an addition of 100 square feet would cost about $13,000 to build.
The average cost per square foot for building a house in Wisconsin is about $110. This means a 1000 square foot house would cost about $110,000 to build.
The average cost to paint a warehouse ceiling typically ranges from $0.50 to $2.00 per square foot, depending on factors such as the type of paint, labor costs, and ceiling height. For a 125,000 sq ft warehouse, this would translate to a total cost between $62,500 and $250,000. It's advisable to get multiple quotes from contractors to ensure an accurate estimate tailored to specific conditions.
10,000 square feet is 929.03 square meters. sqrt of 929 = 30.5 meters. So it would have 30.5 width and 30.5 length. That is exactly the length of a netball court. So I would say it would be a very small school.
The question is to vague. There are way too many variables in design and construction to give an accurate answer. Variables such as use, size, location, materials, local conditions all contribute to the cost.