answersLogoWhite

0

Essential facilities

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

What is second response priority?

Essential facilities


What is the third response priority?

Infrastructure


What is the first response priority?

Life safety


What is fema's first response priority?

Life Safety


Do you multiply and divide or add and subtract first in a math sentence?

When dealing with maths always follow the BODMAS rule. Brackets () first priority Of x Second priority Division / Second priority Multiplication * Second priority Addition + Third priority Subtraction - Third priority


When assessing risk the top response priority is?

life safety


What was their second priority behind starting a fire?

nothing


Given default priority what switch is elected to root bridge?

After looking at the priority, the second criterion used is the switch's MAC address. In either case, the lowest number wins.After looking at the priority, the second criterion used is the switch's MAC address. In either case, the lowest number wins.After looking at the priority, the second criterion used is the switch's MAC address. In either case, the lowest number wins.After looking at the priority, the second criterion used is the switch's MAC address. In either case, the lowest number wins.


What do single women do?

a rich single guy , being handsome is second priority


What was katniss second priority behind starting a fire?

That Peeta would lead the Careers to Katniss


What relation holds between priority and first come first serve algorithm?

In scheduling algorithms, the priority method assigns tasks based on their importance, while the First-Come, First-Serve (FCFS) algorithm processes tasks in the order they arrive, regardless of priority. This means that in FCFS, a lower-priority task can delay a higher-priority one if it arrives first. Consequently, the two algorithms can lead to different performance outcomes, particularly in terms of response time and overall system efficiency. In contrast, priority scheduling aims to minimize wait times for high-priority tasks, potentially at the cost of lower-priority ones.


Which five year plan gave priority to heavy industry was?

the answer is first five year plan