Integration testing refers to the process of testing just how well integrated several software components are working together. Both the individual elements as well as the system as a whole are tested via data inputs.

User Avatar

Wiki User

10y ago
This answer is:
User Avatar
More answers
User Avatar

Wiki User

6y ago

The objective of Integration testing is to test the combined modules together and ensure that every combined modules are working as expected.

Integration testing is done to authorize the complete system after developing the various elements of an application. The behavior of all the integrated modules is considered in the Integration testing.

While implementing software testing services, integration testing is the phase in which individual components can be combined without issue into a working system. One component that functions incorrectly can affect another component also, and if undetected at a later stage of development, could lead to serious issues with the delivery and build failure too. This strengthens the need for in-depth system-level analysis accomplished before moving to the next phase in the quality assurance services life-cycle.

In Top to down integration testing approach, top integrated modules are tested and the particular module, for which either an issue is fixed or enhancement is provided, is tested stage by stage until the end of the correlated modules.

In Bottom up testing approach, the lower level modules, functions, and procedures are integrated and then tested. After this the next level of modules will be formed and can be used for integration testing too. This method is helpful in defining the levels of any application developed and makes it easier to report testing progress in the form of percentage.

Sandwich testing approach involve both top down and bottom up testing.

For the reliability and efficiency of a software application, Integration testing must be performed on an updated build that includes the fixes for all the individual modules.

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How integration testing is performed?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Computer Science

What is the preferred order for performing testing on information technology project?

1. unit testing,integration testing, system testing, user acceptance testing. 2. unit testing, system testing , integration testing,user acceptance testing. 3. unit testing, system testing , user acceptance testing,integration testing. 4. unit testing, ,integration testing, user acceptance testing,system testing.


What is waterfall aproach?

Waterfall is a sequential design approach used in software development which includes requirements analysis, design, implementation, testing, integration and maintenance.


Difference between alfa beta testing in software engineering?

Alpha Testing: Alpha testing is testing of an application when development is nearing completion. Minor design changes can still be made as a result of alpha testing. Alpha testing is typically performed by a group that is independent of the design team, but still within the company, e.g. in-house software test engineers, or software QA engineers.Another DefinitionAlpha testing is final testing before the software is released to the general public. First, (and this is called the first phase of alpha testing), the software is tested by in-house developers. They use either debugger software, or hardware-assisted debuggers. The goal is to catch bugs quickly. Then, (and this is called second stage of alpha testing), the software is handed over to us, the software QA staff, for additional testing in an environment that is similar to the intended use. Beta Testing: Beta testing is testing an application when development and testing are essentially completed and final bugs and problems need to be found before the final release. Beta testing is typically performed by end-users or others, not programmers, software engineers, or test engineersAnother Definition:- Following alpha testing, "beta versions" of the software are released to a group of people, and limited public tests are performed, so that further testing can ensure the product has few bugs. Other times, beta versions are made available to the general public, in order to receive as much feedback as possible. The goal is to benefit the maximum number of future users.


What should be mobile application development methodology for better execution?

To maintain the high quality, timely delivery and cost-effective services, following mobile application development methodology is used as one of the top models -Define Strategy: Here we focus on defining strategy and analyses business scope.Planning, Analysis and Solution Design phase: Here we analyze user case, functionality of module, database design, system architecture specification, integration and implementation.Development: it involves module coding, module integrationTesting: it involves unit testing, integration testing, regression testing, system interface, code reviews etc.Integration and Deployment of beta version: it involves system integration, deployment, support, training, future release planning, application management.Finally post project operational review.


What is sanity testing in software testing?

A sanity test or sanity check is a basic test to quickly verify if the fixes in code or functionality are working as expected or not. Detailed level testing is not performed here.Main features of Sanity testing are:testing of some limited features.Generally non-scripted or not documentedIs a sub-set of regression testing

Related questions

What is the preferred order for performing testing on information technology project?

1. unit testing,integration testing, system testing, user acceptance testing. 2. unit testing, system testing , integration testing,user acceptance testing. 3. unit testing, system testing , user acceptance testing,integration testing. 4. unit testing, ,integration testing, user acceptance testing,system testing.


How can project Scheduling affect integration testing?

Scheduling is the approximate time frame definition for future events. Scheduling, for example, is used in laying out the main Framework activities for the project. If the project is behind schedule, then integration testing can't even begin. Integration testing happens after unit testing which happens after coding. Additionally, if scheduling is tight, then project managers could potentially reduce the time in integration testing thus reducing the quality or increasing the cost.


A testing process that exercises a software system's coexistence with others by taking multiple integrated systems that have passed system testing as input and tests their required interactions?

Integration Testing, abbreviated I&T. Is the phase of software testing in which individual software modules or individual applications, client and server applications on a network, combined and tested as a group. Integration testing is done after Unit testing is completed and before system testing starts. Integration testing takes modules that have been unit tested as its input, groups them in larger aggregates, applies tests defined in an integration test plan to those aggregates, and delivers as its output the integrated system ready for system testing. Different types of integration testing are big bang, top-down, and bottom-up.


What comes after unit testing?

These are the next testing levels after unit testing: 1 Integration testing 2 Component interface testing 3 System testing 4 Operational Acceptance testing


What are the advantages and disadvantages of top down and bottom up testing?

Integration testing is a typically incremental process which involves testing whether individual modules within a system interact correctly.Top-down Integration TestingTop-down integration testing involves starting at the top of a system hierarchy at the user interface and using stubs to test from the top down until the entire system has been implemented. There is no need for test drivers as the user interface provides the means to enter test data. Using Top-down integration testing means that there is a visible system with a certain level of functionality early on.Bottom-up Integration TestingBottom-up integration testing is the opposite of Top-down integration testing. Sub-systems are initially formed at the bottom of the system hierarchy. These are then tested and added to the modules above them to form larger sub-systems which are then tested. Bottom-up integration testing requires the heavy use of drivers instead of stubs.


What is exact difference between integration and system testing?

After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.


Difference between alpha testing and beta testing?

Alpha Testing is always performed at the time of Acceptance Testing when developers test the product and project to check whether it meets the user requirements or not.Beta Testing is always performed at the time when software product and project are marketed.


In which software testing technique both stub and driver are used?

integration testind


Difference between integration testing and regression testing?

Integration testing - It is the phase of software testing in which individual software modules are combined and tested as a group. It follows unit testing and precedes system testing.Regression testing is a type of software testing that seeks to uncover new software bugs, or regressions, in existing functional and non-functional areas of a system after changes such as enhancements, patches or configuration changes, have been made to them.


What is system integration testing?

SYSTEM INTEGRATION TESTING:- *It tests the interactions between different systems and may be done after system testing. *It verifies the proper execution of software components and proper interfacing between components within the solution. *The objective of SIT Testing is to validate that all software module dependencies are functionally correct and that data integrity is maintained between separate modules for the entire solution.


What is the normal order of activities in which software testing is organized?

unit ,integration, validation then system


What are the differences between interface and integration testing?

interface is called look and feel where as integration called interface between two module how it is reacting with other module.