A week and a half would be a week ,3 days ,and 12 hours or 10 days and 12 hours .
about 1 week
They are very practical. If you had a glass half filled with water, an optimist would say it was half full, a pessimist would say it was half empty but and engineer would observe that the glass was twice as big as it needed to be.
I would say the peak traffic times would be in the evening and on weekends.
As long as 40 hours a week, but sometimes it is loooong hours sitting in front of a computer. Some animators even get eye strain, carpal tunnel problems, and back strains.
The Bessemer process generally took only a few minutes to an hour to make as much steel as the older process could make in a week
No, a week is 7 days long, so half a week would be 3.5 days.
A week and a half is 10.5(Ten and 1/2) Days.
One week. If you take half of four men to do half of the work the four men did in a week, you would get half the work done in the same amount of time the four men did the work in a week.
as long as you would any other time
604,800 seconds, if the half term is a week long.
a week to a week and a half
About a week and a half.
A week and a half.
About a week in a half
Seven as long as two halves equal one hole. If one and a half eggs are layed in a day and a half, the one egg is layed a day. Ahh, but the person above has failed to account for the extra half a week. It says a week and a half, so that would be 10 and a half eggs, because 7/2 = 3 and a half and 7+3.5=10.5 eggs
A week is 7 days. Therefore, a week and a half would be 10.5 days.
A week and a half is longer than a week.A week and a half is longer than a week.A week and a half is longer than a week.A week and a half is longer than a week.A week and a half is longer than a week.A week and a half is longer than a week.A week and a half is longer than a week.A week and a half is longer than a week.A week and a half is longer than a week.A week and a half is longer than a week.A week and a half is longer than a week.