A career path is like what sort of Job you are going to do. A career ladder is when you start at the bottom of the career chain and work your way up. Example: Bagger, to check-out, to PIC (person in charge), to assistant manager, etc.
A virtual channel defines a single point to point connection, identified by its virtual channel identifier (VCI). A virtual path however, is a bundle of virtual channels that share the same end-point. Hence, a virtual path can be considered as a container that contains several virtual channels. Each virtual path is identified by its unique virtual path identifier (VPI). sridhara................
BUS
Critical path method - This is the schedule network analysis technique used to identify the schedule flexibility and the critical path of the project schedule network diagram. The critical path is the longest path (sequence of activities) in a project schedule network diagram. Because it is the longest path, it determines the duration of the project and hence the finish date of the project given the start date.The second important feature of the critical path method is to identify the flexibility in the project schedule by calculating the early and late start and finish dates of each activity on each path. The schedule flexibility of an activity is measured by the positive difference between the late start date and the early start date for the activity and is called float time or total float.Without a proper Critical Path Analysis, an efficient Schedule for the Project cannot be created
Router
- a problem in NP means that it can be solved in polynomial time with a non-deterministic turing machine - a problem that is NP-hard means that all problems in NP are "easier" than this problem - a problem that is NP-complete means that it is in NP and it is NP-hard example - Hamiltonian path in a graph: The problem is: given a graph as input, an algorithm must say whether there is a hamiltonian path in it or not. in NP: here is an algorithm that works in polynomial time on a non-deterministic turing machine: guess a path in the graph. Check that it is really a hamiltonian path. NP-hard: we use reduction from a problem that is NP-comlete (SAT for example). Given an input for the other problem we construct a graph for the hamiltonian-path problem. The graph should have a path iff the original problem should return "true". Therefore, if there is an algorithm that executes in polynomial time, we solve all the problems in NP in polynomial time.j
difference between shortest path and alternate path
Relation between phase difference and path difference is path difference/wavelength=phase difference/2*pi
The path difference is the difference in the physical distance between the two sources to the observer, i.e., the difference in distance travelled from the source to the observer.
The Series circuit is a single path for current flow. like Christmas tree lights, one part of the path is obstructed (a light that's bunt out ) they all go out. Parallel circuits have more than one path for the current flow, so if one path is obstucted, the current can take another path (like rungs of a ladder )
Trajectory is the path a projectile follows Parabola is the shape of this path
A base path is the path determined by the runner as he is travelling between bases, and the base line is the the direct lines between the two bases.
not sure
not sure
The "Path" is the route map that leads to the folder that contains the "Filename"
The difference between an Euler circuit and an Euler path is in the execution of the process. The Euler path will begin and end at varied vertices while the Euler circuit uses all the edges of the graph at once.
Absolute path: Path from root directory (it is the same place, wherever the current path is) Relative path: Relative to the current path.
state function did not depend on the path , it depends on the initial and final point of the system where as path function depends on the path of the reaction.