CMM verifies the quality of the overall software development process beginning from problem definition. Software validation and verification are the subitems of CMM.
waste company
Audit your firm for acquiring CMM level.
A Component Maintenance Manual (CMM) is the documentation created by the original equipment manufacturer (OEM) for an aircraft line replacement unit (LRU.) It typically includes a description of operation, specifications, testing requirements, special tools and fixtures, disassembly instructions, assembly instructions, and an exploded image of the component along with part numbers (illustrated parts list.) The FAA refers to CMMs as Instructions for Continued Airworthiness (ICA.)
Validation is done at the end of the development process and takes place after verification process is completed. According to CMM we can also define it as the process of evaluating software during or at the end of the development process to determine whether it satisfies specified requirements.
currently its cmm level 3 and applied for cmm level 5
Often called "the CMM," the Software CMM was the first capability maturity model. It was adopted by organizations worldwide, primarily by software development companies. The Capability Maturity Model for Software (also known as the CMM and SW-CMM) has been retired, and CMMI (Capability Maturity Model Integration) replaces it. The SEI no longer maintains the SW-CMM model, its associated appraisal methods, or training materials, nor does the SEI offer SW-CMM training. All SW-CMM appraisal results from CBA IPI and SCE appraisals expired on December 31, 2007. After December 31, 2007, all SW-CMM ratings will be considered invalid and should not be advertised.
cmmi is is an integrated model for system, software, supplier sourcing and ippd. but cmm have separate model for all these things
CMMI Level 3 as of April, 2011
SEI is the Software Engineering Institute. CMM stands for Capability Maturity Model. CMM has been replaced by CMMI (Capability Maturity Model Integration). For full details, go to http://www.sei.cmu.edu/cmmi/faq/comp-faq.html.
CMM expands to Capability Maturity Model. A rating of 1 (lowest) to 5 (highest) is given that rates the maturity of software development process in a company. PCMM is People CMM and refers to human resources development within a asoftware organization.
It is: cmm or CMM = 1900
It is 122.5 cmm (whatever cmm means).
CMM level V
The Capability Maturity Model (CMM) in software engineering is a model of the maturity of the capability of certain business processes. A maturity model can be described as a structured collection of elements that describe certain aspects of maturity in an organization, and aids in the definition and understanding of an organization's processes.
Obviously its CMM Level 5