I believe you mean /I and /C switches, page 67 of the Lab Guide to Jean Andrew's Guide to Software. The /I and /C switches bypass actions that would check the integrity of the file system. This process is usually time consuming especially on large hard drives.
The amount of force that is needed to bend a steel fence post depends with the steel post in question. The force that is required is therefore calculated based on the material in question.
The energy needed to cut down a tree depends on the size of the tree. Small trees need a less amount of energy than large trees.
In the minimum coin change problem using dynamic programming, the minimum number of coins required to make a given amount of change is calculated by finding the optimal combination of coins that add up to that amount. This involves breaking down the problem into subproblems and finding the minimum number of coins needed for each subproblem. The final answer is the minimum number of coins needed to make the given amount of change.
Not really no. Though, if you had anything less than 5-8 computers you'd probably just use a workgroup. Then if you start getting more your better off using a domain.
An oar is a class 3 lever. This is because the oar, like all class 3 levers, is not used to reduce the force needed to move the load, but is used to increase the amount of travel of the load.
the amount needed is the amount that's taken by the bear
Reduce means lessening the amount of items or resources that are needed and using only the amount that is needed
'The amount needed to load something.' You didn't specify which word you were asking about, so I'll do all of them: the, a definite article specifying the noun amount amount, a noun and the subject needed, a verb acting as an adjective modifying the noun amount (easier to recognize when worded 'needed amount') to load, the verb something, indefinite pronoun standing in for a thing unknown
Memory, CPU, perhaps virtual memory on the system drive, and temporary space on the hard drive being defragmented. How much of each is needed depends on the software used to do the defragmentation.
The amount of time needed to climb Mount Everest is usually around 60 days.
The two amounts are the same but have the opposite sign (positive vs negative).
Excess.
surplus
none
at least 40 pounds of fertilizer is needed to adequately cover your backyard. let f= the amount of fertilizer needed
You need the amount of water, the temperature of the water, and the desired temperature.
An ammount which is over and above what is needed is surplus.