A standard Canter Elf truck typically has a payload capacity of around 1.5 to 2.5 cubic meters of sand, depending on the specific model and configuration. It's important to check the truck's specifications, as variations can exist based on the model year and equipment. Always ensure proper loading to avoid exceeding weight limits for safety and legal compliance.
To determine how many standard size bricks are needed for 1 cubic meter, you can use the typical dimensions of a standard brick, which is approximately 190 mm x 90 mm x 90 mm. This volume is about 0.001539 cubic meters per brick. Therefore, you would need roughly 650 to 700 standard bricks to fill 1 cubic meter, accounting for mortar space and wastage.
1 cubic meter is 1.308 cubic yards.
1 meter = 10 decimeter 1 cubic meter = 1000 cubic decimeter
There are approximately 1.30795 cubic yards in a cubic meter.
No cubic decimeters are in a meter. There are 1000 cubic decimeters in 1 cubic meter.
0.001 cubic meter
1 cubic meter ≈ 35.3146667 cubic foot
1 cubic meter is 1,000 cubic decimeters.
There are 1,000 liters of water that can fit in 1 cubic meter. For water, 1 milliliter is equivalent to 1 cubic centimeter.
one cubic meter is 35.3 cubic feet
Each cubic meter is about 35.3147 cubic feet.
1 (cubic meter) = 35.315 cubic feet.