2100 x 1/12= 175 cu ft

175 cu ft/27 cu ft per yard = 6.5 cu yds

User Avatar

Wiki User

12y ago

What else can I help you with?

Related Questions

How many cubic feet 2 yards wide 3 yards long 1 yard deep?

162 cubic feet.


How many cubic yards of topsoil do you need for 550 sq ft at 3inches deep?

It takes 5.0926 cubic yards or 137.5 cubic feet.


How many cubic yards are in 5.6 acres 3.5 feet deep?

5.6 acres*3.5ft = 27104 sq yards*1.166... yards = 31621.33... cubic yards.


How many yards of topsoil to cover 855 sq feet at 6 inches deep?

You would need 31.88 cubic yards of topsoil to cover 855 sq feet at 6 inches deep.


How many yards of concrete do you need for my project 11 feet by 13 feet 4 inches deep?

1.77 cubic yards


How many cubic yards are in a trench 210 feet long 6 feet wide and 9 feet deep?

There are 35 cubic yards in a trench that is 210 feet long, 6 feet wide, and 9 feet deep. This can be calculated by multiplying the length, width, and depth in feet (210 x 6 x 9) and then dividing by 27 to convert cubic feet to cubic yards.


How many cubic feet feet is 052 cubic yards?

0.52 cubic yards = 14.04 cubic feet.


How many square feet is thirty cubic yards at 2 inches deep?

4860 sq feet


How many yards of concrete needed for 5000 square feet 8 inch deep?

123.44 cubic yards


How many yards of sand do you need for 24 feet by 24 feet at 4 inches deep?

24 feet X 24 feet X 1/3 feet = 192 cubic feet 192 cubic feet / 27 cubic feet per cubic yard = 7.11 cubic yards


How many yards of concrete do you need to cover 60 feet by 100 feet with a 3 inch deep pour?

55.56 cubic yards.


A pit is 9' wide by 30' long by 2' deep how many cubic yards are in the pit?

It is 9*30*2 cubic feet = 540 cubic feet 1 cubic yard = 27 cubic feet so 540 cubic feet = 540/27 =20 cubic yards