There are nine cubic feet in one cubic yard, so: 10 X 6 X 1.5 / 9 = 10.
1.7572 cubic yards
8.25 cubic yards of concrete
To calculate the amount of concrete needed to cover 3,000 square feet at a thickness of 6 inches, first convert the thickness from inches to feet: 6 inches is 0.5 feet. Then, multiply the area by the thickness: 3,000 sq ft × 0.5 ft = 1,500 cubic feet of concrete. To convert cubic feet to cubic yards (since concrete is typically measured in cubic yards), divide by 27: 1,500 cu ft ÷ 27 = approximately 55.56 cubic yards. Therefore, you will need about 56 cubic yards of concrete.
To calculate the amount of concrete needed for a 715 square foot area with a thickness of 4 inches, first convert the thickness from inches to feet: 4 inches is 1/3 of a foot. Next, multiply the area by the thickness: 715 sq ft × (1/3 ft) = approximately 238.33 cubic feet. Since concrete is typically ordered in cubic yards, convert cubic feet to cubic yards by dividing by 27, which gives about 8.81 cubic yards of concrete needed.
I make it 12.2 cubic yards.
To calculate the amount of concrete needed for a 900 square foot area, you first need to determine the thickness of the concrete slab. Once you have the thickness in inches, divide it by 36 to convert to yards. Then divide the total cubic yards by the number of cubic yards in a concrete truck to determine how many truckloads you need.
To calculate the volume of concrete needed, first convert the thickness from inches to feet: 4 inches is 1/3 feet. Then, multiply the area (10 square feet) by the thickness in feet: 10 square feet × (1/3 feet) = 10/3 cubic feet. To convert cubic feet to cubic yards, divide by 27 (since there are 27 cubic feet in a cubic yard): (10/3) ÷ 27 = 0.123 cubic yards. Thus, approximately 0.123 cubic yards of concrete is required.
4800 x .33 / 27 = 58.66 yards
Convert the measurement in square feet to square yards and the thickness in inches to yards. 3 feet = 1 yard 9 square feet = 1 square yard. : 1100 square feet = 1100/9 = 122.2222 sq yards 36 inches = 1 yard 5 inches = 5/36 = 0.13888 yards. The amount of concrete required = 122.2222 x 0.13888 = 16.975 cubic yards In practice, an order would be sent for 17 cubic yards of concrete.
about 17 yards of concrete (it's sold by the cubic yard)
You cannot "fill" a cubic measurement with a square measurement.I think you meant cubic yards.1 cubic yard = 27 cubic feet.Your concrete slab is 1600 x 4/12 cubic feet = 533.333333... cubic feet.533.333333... cubic feet / 27 = 19.753 cubic yards (rounded to third decimal).
This area requires 2.5 cubic yards.