In a redevelopment project, "CC" typically stands for "Construction Certificate." This certificate is a crucial approval issued by local authorities, indicating that a proposed construction project meets all relevant building codes, zoning regulations, and safety standards. Obtaining a CC is essential before commencing construction, as it ensures that the project is compliant with legal requirements and can proceed without legal complications.
MEOW
S. Minshull has written: 'Brownfield site redevelopment and the implications for the project manager'
A development of a building usually consists of constructing a brand new structure from the ground up where none previously existed. A redevelopment is usually a project that requires a refurbishment, retrofitting, and floor plan adjustment to an existing structure.
Boston Redevelopment Authority was created in 1957.
Urban Redevelopment Authority was created in 1974.
Niagara Falls Redevelopment was created in 1997.
Las Vegas Redevelopment Agency was created in 1986.
The Area Redevelopment Act was aimed at helping the poor.
Campbell Street in Newcastle was demolished in 2008 as part of a redevelopment project. In its place, the area has been transformed into the new residential and commercial precinct known as "The Well," which includes modern apartments, retail spaces, and public amenities. This redevelopment aimed to enhance urban living and improve the overall aesthetic of the city.
trytiyubtr
Ask your mother
The cost to redevelop the Greenwich Peninsula was approximately £5 billion. This redevelopment project transformed the area into a vibrant mixed-use district with residential, commercial, and leisure facilities.