answersLogoWhite

0

+ or - 75%

User Avatar

Wiki User

12y ago

What else can I help you with?

Related Questions

The height of land at sea level?

Zero level


Can a monster become a level to zero?

no


What is normal level for ketones?

Zero.


What is the valence level for He?

Zero valence


What is at zero degrees altitude?

At zero degrees altitude, you would be at ground level or sea level. This position marks the horizon line where the sky meets the Earth.


What is the equivalent estimate to the speed of sound?

The speed of sound is 331 metres per second at zero degree centigrade and at sea level (air pressure and temperature affect the speed of sound).


What is the Zero Level Distribution Channel?

There can be a number of different levels to each distribution channel. There is the zero level channel, which involves distribution with no intermediaries whatsoever. For smaller markets, using a zero or one level scheme can be quite practical and effective. By Tauqueer :)


How do you estimate 3.7 to the nearest tens?

To the nearest ten: Zero


Is sea level 250 ft?

Sea level is the reference, zero height.


What are the release dates for Level Zero - 2009?

Level Zero - 2009 was released on: USA: May 2009 USA: 18 May 2009 (limited)


How do can zero before numericals words in excel?

If you need to start a word or number with a zero just add an apostrophe immediately before the zero like this '0 excel will then display the zero, however the zero is no longer recognised as a number by the software.


What is Zero cost estimate in civil engineering?

You know, regardless of what specific data QB is relying on when filtering by an amount, the bottom line is that all other estimates show up, but this one project shows up with zero in the estimate cost column. It should not show zero, it should show the estimate amount. So, this isn't necessarily a matter of what data QB is pulling; it's a matter of why isn't QB showing the estimate amount like it does for all others? Why is it showing zero when there's an active estimate?