as unit weight of cement varies from 830kg/cu.m-1650kg/cu.m
volume of cement of 50 kg. varies 0.060241cu.m to 0.030303cu.m
if the cement is port-land cement unit weight would be 1440kg/cu.m
then the volume would be 0.034472 cu.m
Volume of suitcase: 50*34*23 = 39,100 cubic cm
A 50 kg cement bag will hold about 1.3 cubic feet of dry cement powder.
To calculate the cement ratio for 1 cubic meter (cumic) of concrete, you first need to determine the mix ratio (e.g., 1:2:4 for cement, sand, and aggregate). The total parts of the mix are summed, and the volume of cement is calculated based on the proportion of the mix. For example, in a 1:2:4 mix, the total parts are 1 + 2 + 4 = 7. The volume of cement needed is then (1/7) × 1 cubic meter, which equals approximately 0.143 cubic meters. Given that one bag of cement typically weighs 50 kg and occupies about 0.035 cubic meters, you would divide the volume of cement by the volume per bag to find the number of bags: 0.143 / 0.035 ≈ 4.1 bags.
In one cubic meter of M25 concrete, there are approximately 13.33 bags of 50 kg each. This is based on the standard mix proportion of M25 concrete, which uses 1 part cement, 1 part sand, and 2 parts coarse aggregates by volume.
to calculate the volume of any bag we need to know the density. In freshly packed bags the standard density is 1440 kg/m3.Example: to know the volume of a 50kg cement bag we divide the bag weight by the density, i.e.:50 kg ÷ 1440 kg/m3 = 0.0347 m350kg = 0.0347 m3,50kg = 1.23 CFT======================================In the USA, a bag of cement usually weighs 94 pounds and has a volume of 1 cubic foot.
Cement is typically sold by weight in metric tons or by volume in cubic meters. In some cases, it may also be sold in bags of a specified weight, such as 50 kg bags.
To calculate the number of bags of cement required for 1 cubic meter of M15 grade concrete, first determine the mix ratio, which is typically 1:2:4 (Cement:Sand:Aggregate). For M15 concrete, approximately 1 part cement is needed for every 7.5 parts of total volume (1 + 2 + 4 = 7). Given that one bag of cement weighs 50 kg and has a volume of about 0.035 cubic meters, you would need around 7.5 bags of cement for 1 cubic meter of M15 concrete.
(50,000 litres) / (1,000 litres per cubic metre) = 50 cubicke metres
The answer will depend on the volume of each counter.
1 cubic meter of concrete is made up of 1,750kg ballast 300kg cement = 12 bags 25kg 150 litres water or 1,200kg chippings 350kg cement =14 bags 25kg 700kg sand 150 lit water
4 bags of 50 kg each= 200 kg of cement.