system testing
testing id done is to given the product in order to satisfy the customer requirements . which will given the quality assurance .. benefits of testing : if it is customer satisfied the end of the product , then the product it will be good in market for long time .
The definition of product usage is how a consumer uses a certain product. This is done by testing a product.
SYSTEM INTEGRATION TESTING:- *It tests the interactions between different systems and may be done after system testing. *It verifies the proper execution of software components and proper interfacing between components within the solution. *The objective of SIT Testing is to validate that all software module dependencies are functionally correct and that data integrity is maintained between separate modules for the entire solution.
Anyone from electrical profession and has the proper test equipment and can sign and seal to validate the result. In practice this is assigned to technicains which has specialty in power, relay, metering, etc. testing and commissioning group for installed or existing facilities. The cable and wire manufacturers have reflected all data of their product which include resistances done in their laboaratory or by a certified testing entity.
First of all manual testing means front end testing = wrong. The testing which are done by not using any automation testing tools & verification are done manually are called manual testing. With out front end, you can validate or test the system in back end using queries, stored procedures. For example : Run the queries and check the data are populated in respective tables , since your verifying the outcome manually , its also called manual testing
the fair testing will done if you want to done
Validate input
After we are done with coding we do testing . Rigorous means extreme so we can say rigorous testing is one which is done in extreme conditions.
It's usually done in hospitals.
White box testing or unit testing: To do white box testing, knowledge of internal logic code is required. It is mostly done by developers.Black box testing: The functionality of an application is tested; logic code is not required. This testing is done by testers.Block box or system testing: Testing the application without knowledge of underline code of the application. it is done by the testers.
It is test phase which is performed on production environment after product (feature, improvement, change request implementation, bug) is released to this environment. Post Production testing can be done only after all required testing is successfully finished on test environment. The objective of Post Production testing is to ensure that the deployment was performed correctly.
Notary testing can indeed be done in one day. You can find more information at www.notarytrainer.com.