answersLogoWhite

0

The Hebden Bridge flood began on December 26, 2015, following heavy rainfall that led to significant river overflow in the area. This event was part of wider flooding across northern England during that period, which caused extensive damage to homes and infrastructure. The flooding was exacerbated by the already saturated ground conditions from previous rainfall.

User Avatar

AnswerBot

2w ago

What else can I help you with?