The layers of soil from the bottom, or the deepest, layer to top are
The six soil layers in order are topsoil, subsoil, parent material, bedrock, C horizon, and R horizon.
Organic- mostly made up of plant and animal decomposers Topsoil-Made up of earthworms and fungi Eluviation- Made up of sand and silt Subsoil- Made up of clay Regolith-The layer where large rocks are found
You would need approximately 0.15 cubic feet of soil to fill a 6-inch pot. This is equivalent to about 4.24 liters of soil. It's important to leave some space at the top of the pot for watering and plant growth.
1. O - Layers/horizon (organic layer, containing humus). 2. A - Layer/horizon (top soil). 3. E - Layer/horizon (zone of elluviation). 4. B - Layer/horizon (sub-soil). 5. C - Layer/horizon (zone of illuviation/accumulation). 6. D - Layer/horizon (parent materials/bed rocks).
Three tons of topsoil will cover approximately 180 square feet when spread to a depth of 6 inches.
The six soil layers in order are topsoil, subsoil, parent material, bedrock, C horizon, and R horizon.
The opposites sides always add up to 7. So: * If 1 is on top, 6 is on the bottom * If 2 is on top, 5 is on the bottom. * If 3 is on top, 4 is on the bottom. * If 4 is on top, 3 is on the bottom * If 5 is on top, 2 is on the bottom. * If 6 is on top, 1 is on the bottom.
Organic- mostly made up of plant and animal decomposers Topsoil-Made up of earthworms and fungi Eluviation- Made up of sand and silt Subsoil- Made up of clay Regolith-The layer where large rocks are found
-6 just do top in bottom out
6" . A STANDARD RECTANGULAR BACKBOARD IS 42" HIGH. THE TOP OF RIM IS 36" FROM THE TOP OF BACKBOARD, SO THAT LEAVES 6" FROM THE BOTTOM OF BACKBOARD TO TOP OF RIM.
7/6 You just put the bottom number on top and the top number on bottom.
phase 1 lv1 2 at top left, 1 at top right , 4 is in the middle, 6 bottom left, 5 bottom right. lv2 6 at top, 4 middle left, 3 bottom left, 5 middle right, 2 bottom right. lv3 2 at top, 5 at middle left, 3 in middle, 4 middle right, 6 in 3rd won down, 1 at bottom. lv4 7 top left, 5 midle left, 1 in bottom left, 2 in midlde, 4 top right, 6 in middle right, 3 in bottom right. lv5 3 at top, 5 in middle, 6 middle left, 2 midle right, 4 3rd won down, 1 at bottom. lv6 5 at top, 2 middle left, 3 bottom left, 6 midle bottom, 1 bottom right, 4 middle right. lv7 6 top left, 1 middle left, 5 bottom left, 4 in the middle, 3 top right, 7 middle right, 2 in bottom right. lv 8 5 top left, 1midle left, 2 bottom left, 3 bottom right, 7 middle right, 6 top right, 4 in the middle. the code for phase is 321123. this was answered by Alistair burns and i live in kinglassie at 55 mina crecent.
I don't think you can cut a square 6 ways, but I know you can cut it 4 ways.First you can cut it from left to right, then top to bottom,then from the top right corner to the bottom left corner, and then the top left corner to the bottom right corner.
Top 5, left 2, right 4, bottom left 3, bottom center 6, bottom right 1
The are 6, four sides, a top and a bottom.
1 goes on top 5 on the bottom 3 top left 4 top right 6 bottom right 7 bottom left 2 middle left.
The bottom of the mirror frame should be approx 6" above the top of the table, no more than 8".