The Act extended Daylight Saving Time by four weeks from the second Sunday of March to the first Sunday of November, with the hope that it would save 10,000 barrels of oil each day through reduced use of power by businesses during daylight hours.
so the answer is pretty much 10,000 barrels of oil each day!!!
Proven reserves are reserves we know about, potential reserves are those we suspect are present in certain geological formations. The combination of the two along with the estimated size of these reserves gives us the estimated total reserves.
temperature
The truth about the total amount of O2 and CO2 is that they have have the diffrent level of chaning over time.
Total Water Use in the United States Water use in the United States in 2015 was estimated to be about 322 billion gallons per day (Bgal/d), which was 9 percent less than in 2010. The 2015 estimates put total withdrawals at the lowest level since before 1970, following the same overall trend of decreasing total withdrawals observed from 2005 to 2010.
There was $500 million damage to the south of Chile (1960 dollars) , $50 million damage to Japan, $75 million damage to Hawaii and $500,000 damage to the west coast of USA. The total amount of damage losses were estimated at half a billion 1960 dollars
An estimated 30 Million
Population of the Philippines is estimated to be 96 million as of July 2008
total estimated uncollectible accounts as of the end of the year
In the year 2010, an estimated $142.5 billion was spent on advertisements in the United States alone. Worldwide, however, the total amount of money spent on advertisements is even greater. In total, an estimated $467 billion was spent on advertisements.
It is estimated the winners total purse from all the qualifiers upto winning the final is approx £60 million.
The Earth has more water than land area. The Earth's estimated total volume of water is 1.386 billion cubic kilometer or 333 million cubic miles.
The initial budget was $1.4 billion, and $5 billion was spent in preparation. Total estimated to be a bout $7 billion
The ratio, expressed as a percentage, of the total quantity of recovered and unrecovered mineral product after processing with the amount estimated in the ore based on sampling.
75%
Total Estimated Time: 3 hours 23 minutes Total Estimated Distance: 205.29 miles
Total Estimated Time: 45.0 hours 30 minutes Total Estimated Distance: 2987.04 miles
Total Estimated Time: 2 hours Total Estimated Distance: 114.21 miles