Want this question answered?
that is so easy
During a period of economic inflation, most everything is affected. According the sale of new and used construction equipment would slow due to the slowing of building projects.
A total period cost is anything that is not prepaid. To calculate period cost, just include anything that is charged in the period incurred.
A boom.
A business cycle
they have different distances from the sun
gradual
that is so easy
Incubation period is the period between infection and clinical onset of the disease, and latent period is the time from infection to infectiousness.
A taller building will swing back and forth more slowly (or for a longer period) than a shorter one.
The three kingdoms of Egypt did differ since they existed in different time period. They also differed as in the different regions in which they were located.
Fundemental Period of building moving forward and backward
The fundamental building period is simply the inverse of the building frequency at the lowest harmonic - easy right? Basically, every system has a set of frequencies in which it "wants" to vibrate when set in motion by some sort of disturbance (in building design, typically a seismic or wind event) based on the system's mass and stiffness characteristics. The shortest frequency is known as the natural frequency. The inverse of frequency is the period of the system, and more specifically, the inverse of the natural frequency is the fundamental period.
One is a concrete noun and the other is abstract.
A.GentlenessB.Dominance over the weakC.PatienceD.Loyalty to a lord
say what?
Two approaches that are commonly discussed are; transaction approach and capital maintenance approach. In the transaction approach, the income is calculated by analyzing effects of revenue and expense transactions in a period.