Weaver Company's predetermined overhead rate is $18.00 per direct labor-hour and its direct labor wage rate is $12.00 per hour.

User Avatar

Wiki User

12y ago

What else can I help you with?

Related Questions

How do you calculate total manufacturing costs at the end of the period if beginning goods in process is 5000 ending goods in process is 15000 and cost of goods manufactured is 170000?

Total Manufacturing Cost = Cost of good manufactured + Closing Balance - Opening Total Manufacturing Cost = 170000 + 15000 - 5000 Total Manufacturing Cost = 180000


How do you calculate units?

Cost of case divided by number of units. For example you bought a dozen eggs for $ 24.. what is the unit price per egg? $24 / 12 = $2 per egg. or say you are calculating the cost of manufacturing 1 unit.. given: the cost of manufacturing 2000 units of product ABC is as follow, find unit price? Total material cost $ 5000 Total labour cost $ 4000 Other expenses $ 1000 ---------- total cost of manufacturing $ 10000 solution: Total Cost/ no. of unit manufactured 10000/2000 = $5 per unit


How to calculate the cost of good manufactered?

To calculate the Cost of Goods Manufactured (COGM), start by determining the total manufacturing costs incurred during the period, which includes direct materials, direct labor, and manufacturing overhead. Next, add the beginning work-in-progress (WIP) inventory to these total costs and then subtract the ending WIP inventory. The formula can be summarized as: COGM = Total Manufacturing Costs + Beginning WIP - Ending WIP. This will give you the total cost of goods that were completed during the period.


Abel companys manufacturing overhead is 20 percent of its total conversion costs If direct labor is 38000 and if direct material are 47000 the manufacturing overhead is?

Well, honey, if manufacturing overhead is 20% of total conversion costs, and direct labor is $38,000 and direct materials are $47,000, then total conversion costs would be $38,000 + $47,000 = $85,000. So, if manufacturing overhead is 20% of that, it would be 0.20 x $85,000 = $17,000. So, the manufacturing overhead would be $17,000.


How can you calculate variable manufacturing cost per unit?

Total Variable costs divided by the cost of units


How do you calculate unit price?

Cost of case divided by number of units. For example you bought a dozen eggs for $ 24.. what is the unit price per egg? $24 / 12 = $2 per egg. or say you are calculating the cost of manufacturing 1 unit.. given: the cost of manufacturing 2000 units of product ABC is as follow, find unit price? Total material cost $ 5000 Total labour cost $ 4000 Other expenses $ 1000 ---------- total cost of manufacturing $ 10000 solution: Total Cost/ no. of unit manufactured 10000/2000 = $5 per unit


Can you please shut up and calculate the total cost of the project?

Please calculate the total cost of the project.


Formula for Total operating income?

how to calculate total operating income in Manufacturing Sector


How do you calculate Total Cost without Total variable cost?

To calculate the Total Cost without Total variable cost, one should estimate for the variables or substitute for the variables with a variable such as X or Y and then solve for the approximate total cost.


Does prime cost plus conversion cost equal the cost of manufacturing?

Total Manufacturing Cost = Direct Material + Direct Labor + Factory Overheads Prime Cost = Direct material + Direct Labor Conversion Cost = Direct Labor + Factory Overhead So yes prime cost and conversion cost is equal to total manufacturing cost


How do you figure average manufacturing cost per unit?

total cost / number of units


How do you calculate total cost of job?

i