the bridge cost about £1.75m :)
At the start of construction the original estimate was £28,000,000 but by the time it was finished the actual cost was £98,000,000 by the time the bridge opened to the public in 1981 the interest had pushed this up to £150,000,000 as of 2011 the cost of the bridge with interest is £345,000,000 it is also the most expensive bridge crossing in the country at £3 each way for cars
Cost is how much is spent revenue is the annual how much u make
$1,000,000
If I understand the question. It cost 2.5 cents to make a penny.
200
At the start of construction the original estimate was £28,000,000 but by the time it was finished the actual cost was £98,000,000 by the time the bridge opened to the public in 1981 the interest had pushed this up to £150,000,000 as of 2011 the cost of the bridge with interest is £345,000,000 it is also the most expensive bridge crossing in the country at £3 each way for cars
it cost lots and lots of money Eitaibashi Bridge was built in 1698. There are not likely to be any records of its cost. The bridge was replace in 1924-1926. That bridge is called Eitai-bashi or Eitai Bridge.
55 Million.
around $605.8 million dollars!
on averge hw much does a 3 tooth fixed bridge cost
1,184,000 Euros
The Hell Gate Bridge Cost $70.00 to build.
Reportedly, the Rialto Bridge cost approximately 35 dollars to build. The cost of reconstructing the bridge today would require millions.
£2000.000
2,000,167.69
40003002666
$10.00