The equation used to determine total cost is as follows: Total Cost = Fixed Cost + (Average Variable Cost) x Output. The equation to find total cost of a number ("q') of units is: C(q)= 100 + 2q.
To determine the total cost function for a given scenario, one must identify all the costs associated with the scenario, such as fixed costs and variable costs. By analyzing the relationship between the input factors and the total cost, one can derive a mathematical equation that represents the total cost function. This equation can then be used to calculate the total cost for different levels of input factors in the scenario.
Average cost is the total cost of production divided by the number of units produced. It is a measure used in business operations to determine the cost per unit of a product or service. This calculation helps businesses understand their overall cost efficiency and make informed decisions about pricing and production strategies.
Total expenditures depends on the quantity multiplied by the price!
benefit/cost analysis
To find ( x ), the number of coffee creamers remaining after using 41, you can use the equation ( x = 125 - 41 ). This equation represents the total number of coffee creamers initially available minus the number used during the week. Solving for ( x ) will give you the remaining number of coffee creamers.
To determine the total cost function for a given scenario, one must identify all the costs associated with the scenario, such as fixed costs and variable costs. By analyzing the relationship between the input factors and the total cost, one can derive a mathematical equation that represents the total cost function. This equation can then be used to calculate the total cost for different levels of input factors in the scenario.
The equation that would be used to correctly determine the cost of the 3 items is 0.65x=13.85.
Insurance companies will determine that your car is totaled if the cost of the damage approaches or exceeds the car
c=16h
Net Ionic
The equation used to determine the velocity of a wave is: velocity = frequency x wavelength. This equation shows that the velocity of a wave is dependent on the frequency of the wave and its wavelength.
y= 250+1/5x
c=10h !
Yes.
The equation to determine energy used is: Energy Used (J) = Power (W) x Time (s) where Power is measured in watts (W) and Time is measured in seconds (s).
Set 0=(denominator of the System Transfer Function), this is the Characteristic Equation of that system. This equation is used to determine the stability of a system and to determine how a controller should be designed to stabilize a system.
If the cost to repair is more than the vehicle is worth to replace then it is considered totaled.