answersLogoWhite

0

What else can I help you with?

Related Questions

What is difference between chronological load curve and load duration curve?

Load duration curve represents re-arrangement of all load elements of chronological load curve in the order of descending magnitude. It illustrates the relationship between generating capacity requirements and capacity utilization.The area under the load duration curve and the corresponding chronological load curve is equal and represents total energy delivered by the generation station.


Why does price not shift the curve in economic analysis?

Price does not shift the curve in economic analysis because the curve represents the relationship between quantity and price, and a change in price would cause movement along the curve rather than shifting it.


What is mass curve analysis?

I don't know, please


Why doesn't price shift the curve in economic analysis?

In economic analysis, price doesn't shift the curve because the curve represents the relationship between two variables, such as quantity and demand, while price is a result of that relationship. Changes in price lead to movements along the curve, not shifts of the curve itself.


Indifference curve analysis is not much in use because it only tells us that demand curve has a negative slope except when they don't .?

indifference curve analysis is not much in use because it only tells us that demand curve has a negative slope except when they don't ....


What is a value curve analysis?

Value curves are relatively simple but a powerful tool. A value curve analysis tells a company that what customers value and how they can meet the customer's need and competition.


What is the first step in conducting improvement curve analysis?

histpry


How do you find modulus of elasticity from load displacement curve?

The modulus of elasticity is the slope of the linear portion of the curve (the elastic region).


The first step in a hazard analysis is?

quantification of fire by fire design curve


How can I create a reliable GC calibration curve for accurate analysis of my samples?

To create a reliable GC calibration curve for accurate analysis of your samples, you should start by preparing a series of standard solutions with known concentrations of the target analyte. Inject these standard solutions into the GC instrument and record the detector response for each concentration. Plot the detector response against the concentration to create a calibration curve. Ensure that the curve is linear and passes through the origin. Use this calibration curve to quantify the concentration of the analyte in your samples by comparing their detector responses to the curve. Regularly check and update the calibration curve to maintain accuracy and reliability in your analysis.


What are the advantages of automatic load sharing of transformers?

advantages for automatic load sharing of transformer with protective analysis


What is load line concept?

A load line is used in graphical analysis of nonlinear electronic circuits, representing the constraint other parts of the circuit place on a non-linear device, like a diode or transistor. It is usually drawn on a graph of the current vs the voltage in the nonlinear device, called the device's characteristic curve. A load line, usually a straight line, represents the response of a linear circuit connected to the nonlinear device in question. The operating point(s) of the circuit are the points where the characteristic curve and the load line intersect; at these points the current and voltage parameters of both parts of the circuit match