preliminaries are the associated costs that contractors incur in the completion of a project, for example the cost of hoarding or a site office, or heating the site office, (rather than the costs of the actual building work , e.g. the bricks, blocks)

User Avatar

Wiki User

17y ago

What else can I help you with?

Related Questions

How does a construction firm deal with preliminaries?

based on their previous projects' actual preliminaries


What is the usual percentage of preliminaries in construction contract?

20% of the total cost


What is included in construction preliminaries?

Construction preliminaries refer to the initial costs and activities necessary to prepare for a construction project. This typically includes site setup, temporary facilities, project management expenses, insurance, and permits. Additionally, it encompasses utilities, safety measures, and the mobilization of labor and equipment. Overall, preliminaries are essential for ensuring that the project can proceed smoothly and in compliance with regulations.


What is preliminaries in BOQ?

road preliminaries?


What is prelims?

Prelims is an abbreviation for preliminaries in a construction project and refer to costs for works not directly associated with the building of something such as surveys, insurance or mobilisation costs.


What are list of building preliminary items?

Building preliminaries involves site investigation,access road,site clearance,feasibility study etc before the actual construction begins.


What is the plural of preliminary?

The plural of preliminary is preliminaries.


What are 20 list of Preliminaries items?

Preliminaries in a project or construction context typically include items that set the stage for the main work. A list of 20 preliminaries items might include: Site preparation and clearing Temporary site facilities Utilities connections Safety measures and signage Temporary fencing Environmental controls Insurance and bonds Permits and approvals Site drainage systems Access roads and pathways Waste management plans Construction scheduling Site security measures Temporary power supply Water supply arrangements Material storage areas Communication systems Labor facilities (e.g., rest areas) Traffic management plans Quality control procedures These items ensure that a project is set up efficiently and safely before the main construction begins.


What are the release dates for Letter to Loretta - 1953 The Preliminaries 8-22?

Letter to Loretta - 1953 The Preliminaries 8-22 was released on: USA: 19 March 1961


How do you complete preliminaries in bill of quantities?

To complete preliminaries in a bill of quantities you have to figure out the amount of the certain product that you used was. So you will pay so much based on how much of the material or product you needed.