answersLogoWhite

0

What else can I help you with?

Related Questions

Who has primary responsibility for developmental test and evaluation functions throughout dod?

Department of defense


What phase of the SE process is developmental test and evaluation a critical element in providing feedback?

Engineering and Manufacturing Development


Is The service Developmental Test and Evaluation agency responsible for the establishment of Critical Operational Issue?

Yes, the Developmental Test and Evaluation agency is responsible for evaluating and assessing the operational effectiveness and suitability of a system. They may identify critical operational issues, but the responsibility for establishing them typically lies with the program office or the operational user community.


Which one of the following test and evaluation (T and E) products is required at Milestone C?

At Milestone C, the required test and evaluation (T&E) product is the "Test Readiness Review" (TRR). The TRR assesses whether a system is ready to proceed into operational testing and ensures that all necessary tests have been completed successfully. This review evaluates the adequacy of the test plans, the completion of required developmental testing, and the readiness of the system for live operational testing.


Technical discipline has the following goal to compare a system or components against requirements and specifications?

Test and Evaluation


What is one of the following test and evaluation products required at milestone b?

One of the required test and evaluation products at Milestone B is the Initial Operational Test and Evaluation (IOT&E) plan. This plan outlines the strategy for assessing the system's operational effectiveness, suitability, and survivability in a realistic operational environment. It ensures that the system meets the necessary performance requirements before moving into the production phase.


What statement accurately reflects what occurs during Developmental Test and Evaluation?

Developmental Test and Evaluation (DT&E) is a rigorous process that assesses the performance, reliability, and technical aspects of a system under development. It involves testing prototypes in a controlled environment to identify and rectify any design flaws or weaknesses before full-scale production and deployment. The results of DT&E help ensure that the final product meets required specifications and objectives.


What is the relationship between test measurement and evaluation?

The relationship between the three concept of test,measurement and evaluation are closely related with evaluation coming first followed by measurement and test.The relationship is such that if the need of evaluation arises,it required measurement which will reguired the used of test


Characterize the types of variables and measures required under a t-Test?

Dependent & independent


Which one of the following test and evaluation (T and ampE) products is required at Milestone C?

At Milestone C, the required test and evaluation (T&E) product is the Test and Evaluation Master Plan (TEMP). The TEMP outlines the overall strategy for testing and evaluating the system, including the objectives, methodologies, and resources needed to assess the system's performance and operational effectiveness. This document is crucial for ensuring that the system meets the necessary requirements before proceeding to production.


Which one of the following organizations would evaluate measures of effectiveness to determine how well a munitions system can perform its mission?

marine corps operational test and evaluation activity


Will there be a urine test when you get a drug evaluation?

yes