answersLogoWhite

0

What else can I help you with?

Continue Learning about Electrical Engineering

What size 4 core steel wired armored cable is needed to supply 100 amp supply at 128 meter long?

Well work out your CSA size from what you got. If you've got the wiring regulations you can look it up there. Takes some time but you'd find most of it in there on what you need.


How do you identify if an English Electric HRC fuse CSA C22.2 No. 106 is type J?

Usually the type of fuse is encoded into the fuse number. For example a English Electric fuse C20J, the C represents that the fuse is a cartridge type, the 20 is the amperage of the fuse and the J represents the speed of the fuse. Also the J states that the fuse is a type J fuse.


What is the best cable or wires for home finolex havells v guard anchor?

As long as the cables have the UL or CSA certification stamped on the cable both are good. The deciding factor should be the cost of one over the other. Beware of knock offs coming into the market place from off shore countries. Using these products could be a concern if you have to make a claim on your house insurance.


What is the IEE regulations on space factors in conduits and ducts?

This topic is covered in the IEE's On-Site Guide, a supplement to BS 7671:2008 Regulations for Electrical Installations.'Grouping' describes to the mutual heating effect of adjacent conductors. The effect of grouping acts to reduce the number of cables actually allowed into an enclosure because, as the number of circuits increases, the current-carrying capacity of the cables reduces -requiring the use of cables with larger cross-sectional areas! And using cables with larger cross-sectional areas may then require us to use larger-diameter conduit.In practice, this might also mean distributing the cables between, say, two smaller conduits (or by using a small trunking system).Guidance in this is provided by an equation called a space factor, where:space factor = [(csa of all cables)/(internal csa of conduit)] x 100 %...where the maximum permissible space factor is 40%. In other words, the area of the cables must not exceed 40% of the internal cross-sectional area of a conduit. The 60% empty-space requirement is intended to enable the dissipation of the heat produced by the current-carrying conductors grouped inside the conduit.


How do you write Verilog code for modified booth encoder?

1.booth encoder module:module booth_encode(input [2:0] X,output reg[2:0] SDN);always @ (X)beginif(X==8'b000) SDN=3'b000;else if(X==3'b001) SDN=3'b100;else if(X==3'b010) SDN=3'b100;else if(X==3'b011) SDN=3'b010;else if(X==3'b100) SDN=3'b011;else if(X==3'b101) SDN=3'b101;else if(X==3'b110) SDN=3'b101;else if(X==3'b111) SDN=3'b000;else SDN=3'bx;endendmodule2.Booth decoder module:module booth_decoder(input [7:0] Y,input [2:0] beo,output reg[8:0] bdo);reg [8:0]A;reg [7:0]X;always @(Y,beo)begincase(beo)3'b000:bdo=9'b000000000;3'b100:bdo={1'b0,Y};3'b101:beginX=(~Y)+1'b1;bdo={1'b1,X};end3'b010:bdo={Y,1'b0};3'b011:beginA={Y,1'b0};bdo=(~A)+1'b1;endendcaseendendmodule3.carry save adder module:module csa(input [14:0] P0,input [12:0] P1,input [10:0] P2,input [8:0] P3,output [14:0] P);wire sb,sc,sd,se,sf,sg,sh,si,sj,sk,sl,sm,sb1,sc1,sd1,se1,sf1,sg1,sh1,si1,sj1,sk1,sl1,sm1,ca,cb,cc,cd,ce,cf,cg,ch,ci,cj,ck,cl,cm,ca1,cb1,cc1,cd1,ce1,cf1,cg1,ch1,ci1,cj1,ck1,cl1,c00,c01,c1,c2,c3,c4,c5,c6,c7,c8,c9,c10,c11;hah01(P0[0],1'b0,P[0],c00);ha h02(P0[1],1'b0,P[1],c01);ha h1(P0[2],P1[0],P[2],ca);ha h2(P0[3],P1[1],sb,cb);fa f01(P0[4],P1[2],P2[0],sc,cc);fa f02(P0[5],P1[3],P2[1],sd,cd);fa f03(P0[6],P1[4],P2[2],se,ce);fa f04(P0[7],P1[5],P2[3],sf,cf);fa f05(P0[8],P1[6],P2[4],sg,cg);fa f06(P0[9],P1[7],P2[5],sh,ch);fa f07(P0[10],P1[8],P2[6],si,ci);fa f08(P0[11],P1[9],P2[7],sj,cj);fa f09(P0[12],P1[10],P2[8],sk,ck);fa f010(P0[13],P1[11],P2[9],sl,cl);fa f011(P0[14],P1[12],P2[10],sm,cm);ha h3(sb,ca,P[3],ca1);ha h4(sc,cb,sc1,cb1);ha h5(sd,cc,sd1,cc1);fa f11(se,cd,P3[0],se1,cd1);fa f12(sf,ce,P3[1],sf1,ce1);fa f13(sg,cf,P3[2],sg1,cf1);fa f14(sh,cg,P3[3],sh1,cg1);fa f15(si,ch,P3[4],si1,ch1);fa f16(sj,ci,P3[5],sj1,ci1);fa f17(sk,cj,P3[6],sk1,cj1);fa f18(sl,ck,P3[7],sl1,ck1);fa f19(sm,cl,P3[8],sm1,cl1);ha h6(sc1,ca1,P[4],c1);fa f1(c1,sd1,cb1,P[5],c2);fa f2(c2,se1,cc1,P[6],c3);fa f3(c3,sf1,cd1,P[7],c4);fa f4(c4,sg1,ce1,P[8],c5);fa f5(c5,sh1,cf1,P[9],c6);fa f6(c6,si1,cg1,P[10],c7);fa f7(c7,sj1,ch1,P[11],c8);fa f8(c8,sk1,ci1,P[12],c9);fa f9(c9,sl1,cj1,P[13],c10);fa f10(c10,sm1,ck1,P[14],c11);endmodule4.half adder module:module ha(input a,input b,output sum,output carry);xor x1(sum,a,b);and a1(carry,a,b);endmodule5.full adder module:module fa(input a,input b,input c,output sum,output carry);wire w1,w2,w3;ha h1(a,b,w1,w2);ha h2(w1,c,sum,w3);or o1(carry,w2,w3);endmodule6.Final module:module final_module(input [7:0] X,input [7:0] Y,output [14:0] P);reg [2:0]a,b,c,d;wire [2:0]sdn1,sdn2,sdn3,sdn4;wire [8:0]p0,p1,p2,p3;wire [14:0]p00;wire [12:0]p01;wire [10:0]p02;always @(X)begina={X[1],X[0],1'b0};b={X[3],X[2],X[1]};c={X[5],X[4],X[3]};d={X[7],X[6],X[5]};endbooth_encode b1(a,sdn1);booth_decoder d1(Y,sdn1,p0);assign p00=p0[8]?{6'b111111,p0}:{6'b000000,p0};booth_encode b2(b,sdn2);booth_decoder d2(Y,sdn2,p1);assign p01=p1[8]?{4'b1111,p1[8:0]}:{4'b0000,p1[8:0]};booth_encode b3(c,sdn3);booth_decoder d3(Y,sdn3,p2);assign p02=p2[8]?{2'b11,p2}:{2'b00,p2};booth_encode b4(d,sdn4);booth_decoder d4(Y,sdn4,p3);csa c1(p00,p01,p02,p3,P);endmodule

Related Questions

Who sets standards for motor overload protection?

In Canada it is the CSA, Canadian Standards Association that checks for safety of electrical devices. After testing and when approved, the device will have a CSA designation on the equipment. By law, a Canadian electrician is not allowed to make a connection to any electrical device that doesn't have a CSA certification label attached.


CSA Exam?

Struggling with the ServiceNow CSA exam?


How can I tell if an extension cord is for outdoor use?

Look on the cord for the designation SOW. This type of outdoor flexible cord is for use wet, damp or dry locations and is approved for extra hard usage.The letters mean, S - severe service cord, O - oil resistant outer jacket material and W - (CSA) weather and water resistant (approved for indoor and outdoor use)


When was CSA Air created?

CSA Air was created in 1998.


Who was the only president of the CSA?

Jefferson Davis was the first (and only) president of the CSA.


What was the CSA?

The CSA is the abbreviation for the Confederate States of America.


When was CSA Steaua București created?

CSA Steaua București was created in 1947.


What do the initials CSA mean after a financial consultants name?

CSA means Certified Senior Adviser.


When was CSA Steaua Bucureşti - Handball - created?

CSA Steaua Bucureşti - Handball - was created in 1949.


When was CSA Steaua București - Boxing - created?

CSA Steaua București - Boxing - was created in 1947.


What is the role of csa?

The role of the CSA was to set up their own nation. CSA stands for Confederate States of America or simply the Confederacy. It was set up on February 8, 1861.


How many csa points can you get before losing cdl?

CDL state points and CSA points are 2 different entities. You cannot loose your CDL from CSA, But you could loose a JOB