Load forecasting is used by power companies to anticipate the amount of power needed to supply the demand.
In case of grounded load load is grounded and voltage is measured across it. while in case of floating load load is not grounded instead it is connected in feedback circuit.
Load current is related to load resistance by an inverse relationship. The load current increases linearly as load resistance decreases. Remember, the less resistance, the more current.
A man with a load jumps from a high building. What will be the load experienced by him?
Hope this helpsAn "OFF-Load tap transformer" can only have it's tap adjusted when it is De-energized,while the "On-Load tap transformer" can adjust its tap under load conditions.Kind RegardsHammad KhanUniversity of Western AustraliaAnswerAn 'off load' transformer is one whose secondary is open circuited, and not supplying a load. An 'on load' (not 'load') transformer is one that is connected to a load.
If become easier to lift a load in a wheelbarrow when the load is towards wheel why
Load Factor
The four major load control functions are load forecasting, load scheduling, load dispatching, and load balancing. Load forecasting involves predicting future electricity demand based on historical data and trends. Load scheduling allocates resources to meet the forecasted demand, while load dispatching ensures the optimal generation units are activated to supply the required load. Finally, load balancing maintains the equilibrium between supply and demand in real-time to ensure system stability.
J. A- S. Yasin has written: 'Short term load forecasting'
Electrical load forecasting. "A good electrical load forecast has a direct and significant impact on costly generating unit startups and shutdowns, energy purchases, managing system demand as well as scheduling system upgrades based on predicted load growth."
Samuel A Dobrow has written: 'Weather-sensitive electric load simulation' -- subject(s): Forecasting, Electric power consumption
Think weather forcasting (but way more accurate). It's predicting what load will be throughout the day, week, year, next year+. This is done so power plants can be made ready to operate when they're needed.
Explain Supply forecasting
Spyros G. Makridakis has written: 'Interactive forecasting' -- subject(s): Forecasting, Data processing 'Forecasting : methods and applications' -- subject(s): Forecasting
Judgmental forecasting is the oldest and still the most important method of forecasting the future.
how are satellites used in forecasting insat 1A
forecasting
Are forecasting and indexing ever used together