100
The voltage-restrained overcurrent relay adjusts the pickup setting and characteristic curve of the overcurrent function based on the system voltage. The relay is set pickup greater than overload, and sensitivity increases as the voltage drops. The voltage-controlled overcurrent relay uses an undervoltage element to supervise the operation of the overcurrent element. When the voltage drops below a predetermined level, the undervoltage element permits the operation of the time overcurrent units. Voltage-restrained overcurrent relays can provide faster backup protection than voltagecontrolled overcurrent relays, particularly in cases where the generator voltage does not drop significantly below rated voltage during fault conditions. If the generator voltage always drops below a given voltage level for all faults in which operation is required, the voltage-controlled overcurrent unit may be set to provide faster overall clearing speed
Check that the input and output voltages are as required. Check that the transformer is big enough for the current required for the unit you have.
No. Only Transformer could not be used for DC supply.If yoy need to have DC out put,then rectifier unit required .
ewan ko...................... ikaw ba alam mo
Tis question is incompleet.1000 va =1 kva.This is the power capacity of transformer. A transformer having 2 currents Primary current and secondary current . for that we required both voltage. Simply we can calculate by a formula Voltage x Current x 0.8(power factor)=1000.
The voltage-restrained overcurrent relay adjusts the pickup setting and characteristic curve of the overcurrent function based on the system voltage. The relay is set pickup greater than overload, and sensitivity increases as the voltage drops. The voltage-controlled overcurrent relay uses an undervoltage element to supervise the operation of the overcurrent element. When the voltage drops below a predetermined level, the undervoltage element permits the operation of the time overcurrent units. Voltage-restrained overcurrent relays can provide faster backup protection than voltagecontrolled overcurrent relays, particularly in cases where the generator voltage does not drop significantly below rated voltage during fault conditions. If the generator voltage always drops below a given voltage level for all faults in which operation is required, the voltage-controlled overcurrent unit may be set to provide faster overall clearing speed
According to BS7671:2008, Requirements for Electrical Installations, an overcurrent protection device rated at either 30 A or 32 A is required.
If you're asking about load sizing, I think you already have the answer (at least 150A, although you could go up to 208 for full load, and maybe higher if you can overload the transformer). If you're talking about short circuit rating, you have entirely the wrong information. Short circuit rating will tell you if the fuse (if you're using fusing) mounting is rated to interrupt the available fault current.
Yes, there is a well-defined standard for "water-mist" sprinkler systems for protection of electrical transformers and switch-gear, including required minimum spacing according to the voltages present.
Check that the input and output voltages are as required. Check that the transformer is big enough for the current required for the unit you have.
Depends on the kva rating of the devices to be tested using a transformer.
These two tests are performed on a transformer to determine (i) equivalent circuit of transformer(ii)voltage regulation of transformer(iii) efficiency of transformer. The power required for theseOpen Circuit test and Short Circuit test on transformeris equal to the power loss occurring in the transformer.
That depends on the model of the transformer. I have seen transformers that required 7500 liters and some that needed 2,5 liters.
transformer
No. Only Transformer could not be used for DC supply.If yoy need to have DC out put,then rectifier unit required .
Surge protection is not required in residential environments. However. It is recommended. For commercial, it depends on the city code but usually not required
A zigzag transformer is used in connection with 3 phase and is made up of 6 coils connected in a "Y" manner. Each leg of the "Y" is made up of a coil on a different phase leg of the transformer. The neutral formed by the zigzag connection is very stable. Therefore, this type of transformer, or in some cases an auto transformer, lends itself very well for establishing a neutral for an ungrounded 3 phase system. Many times this type of transformer or auto transformer, lends itself very well for establishing a neutral for an ungrounded 3 phase system. Many times this type of transformer or auto transformer will carry a fairly large rating, yet physically be relatively small. This particularly applies in connection with grounding applications. The reason for this small size in relation to the nameplate KVA rating is due to the fact that many types of grounding auto transformers are rated for 2 seconds. This is based on the time to operate an overcurrent protection device such as a breaker. Zigzag transformers used to be employed to enable size reductions in drive motor systems due to the stable wave form they present. Other means are now more common, such as 6 phase star.