Water heater is real danger, also is a waste of energy, solar energy water heater is able to avoid
Oil rig workers are involved in the extraction of oil and natural gas from underwater reserves. Their roles can vary widely, including drilling, operating machinery, maintaining equipment, and ensuring safety protocols are followed. Workers often live on the rig for extended periods, performing physically demanding tasks in challenging environments. They play a critical role in the energy industry by helping to locate and extract fossil fuels efficiently and safely.
A "cold-stacked" rig is taken out of service for a significant period of time. The rig's crew is laid off, and its doors are welded shut. When a rig is cold stacked, all fixed costs are avoided except for insurance.
It takes 20000 day to build an oil rig.
I have a rig that gets pulled by two horses instead of one horse.
A rig might be a slang term for a large truck that hauls a trailer. A rig might also be the act of manipulating a vote so that it turns out a certain person is the winner. A rig is also a type of fishing set up to catch fish with a net.
It is a customized big rig
The Oil rig in the middle of the rig belonged to BP, or British Petroleum. The rig got to hot, and exploded, therefore causing disaster to the gulf coast
A swab rig is a smaller rig that is used to pull water off the top of a well so the gas can flow at a better rate.
greasy, dirty, hot, labour, sore muscles....
Building an oil rig on water involves several key steps. First, engineers design the rig to ensure it can withstand harsh marine conditions, considering factors like water depth and environmental regulations. Next, the rig is constructed in sections, typically in a dry dock or shipyard, before being floated to the installation site. Finally, the rig is anchored to the seabed, and necessary systems for drilling and production are installed and tested.
At 8 pounds per gallon, the water would weigh 80,000. The entire rig including the load cannot weigh in excess of 80,000 pounds. Could it do so safely? Probably not. The braking system may be overtaxed at that weight. The trailer capacities do not go up to 10,000 gallons anyway. They max at about 8000.
Depending on the force of an explosion, it could kill some of the marine life in the water very close to it. An explosion on a rig also scatters some forms of hazardous debris into the water which pollutes it. Also, an oil rig explosion could also cause a flow of oil or well fluid from a well or pipeline into the water that can cause severe pollution.
Depends on the context in which its used. Could be a "rig" on land or in water. Some jobs require "Riggers / Welders" who work with cranes and must be able to "rig" large loads as well as fabricate crane booms and spreader bars. "rig welder" is a vague term, most likely job specific.
The Man's a rig. Nice rig, dude! How will you rig the race this time, boss?
groupthink - apex
A rig manager oversees the operations of an oil or gas drilling rig, ensuring that all activities are conducted safely, efficiently, and in compliance with regulations. They manage the crew, coordinate logistics, and maintain equipment, while also monitoring drilling progress and addressing any issues that arise. Additionally, they serve as the primary point of contact between the drilling crew and company management, providing updates and reports on operations. Their role is critical in maximizing productivity and minimizing risks on the rig.
they're hot I agree, manly jobs usually attract the hottest girls as well ;)