answersLogoWhite

0

drill holes and insert a concrete lag that follows layout for the door and then attach to the door casing.

User Avatar

Wiki User

15y ago

What else can I help you with?

Continue Learning about Engineering

What is the mix for concrete for an outdoor pizza oven?

Vitcas Heatproof Screed is suitable for outdoor oven a


What does a Screed Operator do?

A paving machine typically has a crew of three... the paver operator, who drives the paver, and the screed operators. The screed is what spreads and levels the asphalt, and the operators adjust the screed plates to ensure that the roadway is laid smooth, is the right thickness, and is adjusted for the road crown when applicable.


How do you remove tile from a concrete floor?

If these are ceramic ect; and they are solid ;leave alone. Depending on what you are going to replace them with;you could screed over joints ect with floor compound . If you have to lift them you could use a chisel or hire a small power tool with a chisel point.;but even then you could be left with rough floor and still have to screed. I your going to lay a vinly you might cover with ply this you would have to be fixed with rawlplugs/screws.


What is vacuum dewatered flooring?

Process In this system, concrete is poured in place & vibrated with a poker vibrator. Then a screed vibrator is run over the surface, supported on channel shuttering spaced 4.0 meters apart. The screed vibrator is run twice to achieve optimum compaction & leveling. After this a system of lower mats & top mat is laid on the green concrete & this is attached to a vacuum pump. This draws out excess water.Benefits 1. Compressive strength of floor increases by upto 60% 2. Tensile strength increases by @ 70% 3. Cement consumption is reduced to the extent of 40%, no cement is required separately for finishing the surface. 4. Abrasion resistance of the floor increases by @ 60% resulting in les wear and rear of the floor surface 5. Shrinkage of concrete is reduced and floor wraps less.


How do you calculate floor mass of concrete screed floor?

The bulk density of screed is 22KN/m³. Simply multiply by the thickness to get a weight. 22kN/m³ = 22000N/m³ 1 Newton = Mass x Acceleration = kg * g (g is acceleration due to gravity) On earth g is 9.8 22000N/m³ = 2245kg/m³ You then multiply this by the thickness to get the surface mass. Say it is 50mm 2245kg/m³ x 0.005m = 112.25kg/m² You then multiply this by the area of the floor to get the total floor weight. If you have 100m² floor area then 112.25kg/m² x 100m² = 11225kg

Related Questions

What is the mortar layer on concrete floor for smooth finish?

screed


What is Screed primarily used for?

Screed is primarily used to smooth concrete after it has been placed on a surface, it is a flat board. It is an essential factor in placing down flooring.


Choose an item that is not an advantage of using a mechanical screed?

allows the use of higher slump of concrete which results in stringer concrete


What is the mix for concrete for an outdoor pizza oven?

Vitcas Heatproof Screed is suitable for outdoor oven a


What is a word associated with concrete?

Cement, aggregate, slump, set, float, screed, finish, pour, broom, form.


How can I form a concrete pad?

To form a concrete pad, you will need to prepare the site by leveling the ground and creating a formwork to contain the concrete. Next, mix the concrete according to the instructions and pour it into the formwork. Use a screed to level the concrete and a float to smooth the surface. Allow the concrete to cure for the recommended time before removing the formwork.


How to pour a concrete pad correctly?

To pour a concrete pad correctly, first, prepare the site by leveling the ground and creating a form to contain the concrete. Next, mix the concrete according to the instructions and pour it into the form. Use a screed to level the concrete and a float to smooth the surface. Allow the concrete to cure for the recommended time before removing the form.


How can I make a concrete pad?

To make a concrete pad, you will need to prepare the site by leveling the ground and creating a form to contain the concrete. Next, mix the concrete according to the instructions on the bag and pour it into the form. Use a screed to level the concrete and a float to smooth the surface. Allow the concrete to cure for at least 24 hours before removing the form.


How can I make a concrete slab?

To make a concrete slab, you need to prepare the site by leveling the ground and adding a base layer of gravel. Then, create a form to contain the concrete mix. Mix the concrete with water according to the instructions, pour it into the form, and level it with a screed. Allow the concrete to cure for several days before removing the form.


How to properly pour a concrete slab?

To properly pour a concrete slab, first, prepare the site by leveling the ground and setting up formwork. Next, mix the concrete according to the instructions, ensuring it is the right consistency. Pour the concrete into the formwork, spreading it evenly and smoothing the surface with a screed. Allow the concrete to cure and set properly before removing the formwork.


How can I lay a concrete slab effectively and efficiently?

To lay a concrete slab effectively and efficiently, follow these steps: Prepare the site by clearing and leveling the area. Create a sturdy formwork to contain the concrete. Mix the concrete according to the instructions. Pour the concrete evenly into the formwork. Use a screed to level the concrete surface. Finish the surface with a trowel for a smooth finish. Allow the concrete to cure properly before using the slab.


How to pour a concrete slab for a garage?

To pour a concrete slab for a garage, first, prepare the site by leveling the ground and setting up wooden forms to contain the concrete. Next, mix the concrete according to the instructions on the bag and pour it into the forms. Use a screed board to level the concrete and a bull float to smooth the surface. Allow the concrete to cure for at least 7 days before driving on it.