answersLogoWhite

0

it works by having the bucket tied to the rope on a pulley system that you lower done into the well and then the bucket fills up and after this you pull the rope and the bucket of water will come up full

User Avatar

Wiki User

15y ago

What else can I help you with?

Related Questions

Is Work done in lowering the bucket into the well?

Yes, work is done when lowering the bucket into the well because a force is applied over a distance, resulting in the displacement of the bucket against the force of gravity. Work is defined as force multiplied by displacement in the direction of the force.


How much work is required to lift a bucket of water from a well?

The work required to lift a bucket of water from a well is calculated using the formula ( W = F \times d ), where ( W ) is work, ( F ) is the force needed to lift the bucket (equal to its weight), and ( d ) is the distance lifted. If the bucket weighs, for example, 10 kg, the force would be approximately 98 Newtons (10 kg × 9.8 m/s²). If the well is 5 meters deep, the work done would be ( 98 , \text{N} \times 5 , \text{m} = 490 , \text{Joules} ). Thus, the total work depends on the weight of the bucket and the depth of the well.


What machine will work best to raise the bucket from the well?

A pulley system attached to a motor or a winch would be best to raise the bucket from the well efficiently. This setup allows for controlled lifting and lowering of the bucket, making it easy to retrieve water or other materials.


What are bucket used for?

They have many uses according to their industry. For example, electric companies use them for repairing electrical lines or Transformers when there is a power outage. The electrician stands in the bucket and is raised to the damaged site for them to work on.


What are bucket trucks used for?

They have many uses according to their industry. For example, electric companies use them for repairing electrical lines or transformers when there is a power outage. The electrician stands in the bucket and is raised to the damaged site for them to work on.


A worker does 25 J of work lifting a bucket sets down same place What is total net work done on the bucket?

The total net work done on the bucket is zero. The worker did 25 J of work lifting the bucket, but since the bucket was set back down in the same place, no net work was done on it.


How does a self-watering rope work to efficiently hydrate plants?

A self-watering rope uses capillary action to draw water from a reservoir to the plant's roots, providing a consistent and efficient hydration method for plants.


Why won't the rope work on Astro Knight Island?

you have to get the rope that is good .the good rope is in the moon crater.


How Is group jump rope played?

In group jump rope you have work as a team


A crate is pulled across a horizontal floor by a rope At the same time the crate pulls back on the rope in accord with Newton's 3rd law Does the work done on the crate by the rope then equal zero?

No, the work done on the crate by the rope is not zero. The work done is equal to the force exerted by the rope multiplied by the distance the crate is pulled. The fact that the crate pulls back on the rope in accordance with Newton's Third Law does not cancel out the work done by the rope.


How does a magnetic can sorter work?

well it uses magnets duhhh.... :P


If your presentation uses a background your text should?

work well with the background