answersLogoWhite

0

Waste is always a factor. The Design Engineers need to consider how materials are made, what sizes are available to order, what dimensions to use, etc. so that contractors are not having to order too much of something just for the pleasure of hacking off pieces and hucking them in the dumpster. Typically 2% to 5% of all the materials cost of a project is waste that goes to a landfill. On a big job that can add up to a lot of dough.

User Avatar

Wiki User

13y ago

What else can I help you with?

Continue Learning about Engineering

What section of the Building Regulations covers the control of waste on a construction site?

The control of waste on a construction site is primarily covered by Part B of the Building Regulations, which pertains to fire safety, and Part H, which focuses on drainage and waste disposal. Additionally, the Construction (Design and Management) Regulations (CDM) 2015 play a crucial role in waste management by requiring risk assessments and proper planning to minimize waste. These regulations emphasize the importance of sustainable practices and effective waste management strategies during construction projects.


How important is waste management for construction sites?

It is important that a construction company has a third party to deal with the waste management problem. Exposing of trash, in the right way is not only helpful to the environment, it will also save the construction company from being fined. Currently there are hundreds of federal,state, and local laws that govern of how one exposes of the waste.


What is scrap material?

Scrap material refers to waste or discarded materials that can no longer be used for their original purpose but can be recycled or repurposed. This can include metal, plastic, wood, paper, and textiles, among other materials. Scrap is often collected from manufacturing processes, construction sites, and general waste streams, and can be processed to recover valuable resources, reduce environmental impact, and promote sustainability. Recycling scrap materials can help conserve natural resources and reduce landfill waste.


What do you call waste material?

Waste material is commonly referred to as "waste" or "refuse." It encompasses any unwanted or unusable materials resulting from human activities, including household trash, industrial byproducts, and organic waste. Additionally, specific types of waste can have distinct names, such as "hazardous waste" for materials that pose a risk to health or the environment, and "recyclables" for materials that can be processed for reuse.


Can A contractor charge for waste factor on jobs?

Yes, a contractor can charge for waste factor on jobs, as it is a common practice to account for materials that may be wasted during the construction process. This waste factor is typically included in the overall project estimate or bid to ensure that the contractor covers potential losses. However, it should be clearly communicated to the client and outlined in the contract to avoid misunderstandings. Transparency about how the waste factor is calculated can help maintain a good working relationship with the client.

Related Questions

How the waste products affect the environment?

Human waste impacts because it pollutes the envrionment that organisms live in.


How is solid volume used in construction?

Solid volume calculations are used in construction to determine the amount of material needed for projects such as foundations, walls, and slabs. By calculating solid volumes, builders can estimate the quantity of concrete, bricks, or other materials required for the construction, helping to avoid excess waste and ensure accurate project planning. Additionally, solid volume calculations play a crucial role in ensuring structural integrity and safety of the construction project.


What is construction and demolition waste?

''Construction waste consists unwanted materials produced directly by construction or industries.'' ''Demolition waste is waste debris from destruction of a building.''


How does M.G Beres Construction Corps handle rubbish removal during and after a construction project?

M.G Beres Construction Corps manages rubbish removal during and after a construction project with a structured approach to ensure efficiency and compliance with regulations. During the construction process, the company utilizes designated containers and dumpsters to collect waste materials, including debris from demolition, excess construction materials, and packaging. This method helps in maintaining a clean and organized work site, reducing potential hazards and improving overall safety. After the completion of a construction project, M.G Beres Construction Corps undertakes comprehensive site clean-up to remove any remaining waste. Their team ensures that all rubbish is properly sorted and disposed of in accordance with local waste management regulations. This includes recycling materials where possible and handling hazardous waste in a safe manner. Their meticulous approach to rubbish removal helps in leaving the site clean and ready for use, reflecting a commitment to thorough and responsible project management.


When was Human Waste Project created?

Human Waste Project was created in 1993.


When did Human Waste Project end?

Human Waste Project ended in 1998.


What can waste material be made into?

Waste material can be made, into what ever you want it to be!


What is construction waste and construction waste crusher machine tell me the details?

Construction waste is resulted from putting up or removing a building. Construction Waste are Waste materials generated by construction activities, such as scrap, damaged or spoiled materials, temporary and expendable construction materials, and aids that are not included in the finished project, packaging materials, and waste which are generated by the workforce. SBM supplies the professional construction waste plant, including jaw crusher, impact crusher, cone crusher and mobile crusher. Of all these construction waster crushers, mobile crusher is the most convenient. You know usually the construction waste is in city and to deal with them we should better use portable equipment. SBM have five series of mobile crusher: jaw crusher series mobile crusher, impact crusher series mobile crusher, cone crusher series mobile crusher, multi-crushing mobile crusher and crawler type mobile crusher. The first four mobile crushers are type mobile crusher and crawler type mobile crusher is crane on-track and is our ultramodern newly designed mobile crusher.


Can you give me an example of an investigatory project about waste management?

Investigatory Project About Solid Waste Proper Management


How can reusable concrete forms help in reducing construction costs and environmental impact?

Reusable concrete forms can help reduce construction costs and environmental impact by eliminating the need for disposable forms, reducing waste, and decreasing the amount of materials needed for each project. This can lead to cost savings on materials and labor, as well as a reduction in overall construction waste and environmental footprint.


Where should construction waste be disposed of?

Construction waste should be disposed of at designated waste disposal sites or landfills to ensure proper disposal and minimize environmental impact.


Dumpster Service?

form_title=Dumpster Service form_header=8233 For what type of project will the dumpster be used?*= () Remodel () Yard / Landscaping waste () Household clean up () Concrete () New Construction () Roofing project Explain what you plan to place in the dumpster.*=""