The length of time that concrete takes to set, will depend on the temperature. It would take approximately 4 hours for concrete to set at a temperature of 80 degrees.
you need to have a ''keyway''---that is a groove in the base concrete,can be cut in if concrete has set,if not set,oil a 2x4lightly(lightly) & imbed it into the base concrete flush.
yes they need to be set in concrete. depending on your fence, one bag of concrete per post should be enough.
a presure washer is the best way to clean concrete, keep in mind to keep moving the presure washer and not let it just set in one spot for to long.
Regular sugar will cause the concrete to never set.
The length of time that concrete takes to set, will depend on the temperature. It would take approximately 4 hours for concrete to set at a temperature of 80 degrees.
is a scinentific method
A concrete driveway typically takes about 7 days to dry completely.
A concrete driveway typically takes about 28 days to cure completely.
A concrete driveway typically takes about 7 days to dry completely.
Driveway concrete typically takes about 7 days to dry completely.
how long does it take for bituman to dry outside
Rockbottom period is 7 days once quality concreting is done and meticulous watering the concrete , otherwise normally 21 days is recokened as the period for curing the concrete( that is, setting the concrete) to take care of failure to adhere to correct processing of laying concrete and curing with water .
Concrete forms should generally be left in place for at least 24 to 48 hours to allow the concrete to properly set and cure. Leaving the forms on for too long can make it difficult to remove them and may result in damage to the concrete.
you need to have a ''keyway''---that is a groove in the base concrete,can be cut in if concrete has set,if not set,oil a 2x4lightly(lightly) & imbed it into the base concrete flush.
around 60-75 years
Mainly re-enforced concrete (concrete that's been set around steel rods). The cables are made from many long strands of steel.