answersLogoWhite

0

it takes 28 days to fully cure, It would be advisable not to drive on it before that because of micro cracks, which will continue to migrate through time, causing spiderwebbing outside of your control joints,

Depends on the cement used some quick cure cements can harden in an hour

User Avatar

Wiki User

17y ago

What else can I help you with?

Related Questions

How long does it take for grape popsicle to harden?

It takes at least 3 days to harden.


How long does it take paint to dry and harden on a newly painted car?

At least a month to dry and another week to harden


How do you cut up a bag of harden concrete mix?

With a sledgehammer.


Can you eat concrete?

if you smother it in kethcup you can eat anything Actually no you cannot eat concrete. Well you should not eat concrete, the body is primarily made up of water. What is needed for concrete to harden? Water. Think about it, it would harden in your lower intestine and you would have some hard crap. Literally. Not a good idea.


What causes concrete to harden?

Chemical reaction of lime and dehydrated gypsum with water.


How long does wood putty take to harden once applied?

Wood putty typically takes around 24 hours to fully harden once applied.


What are the constituents of concrete?

Concrete is composed of water, cement and sand. It has three constituents. Concrete is mixed as a wet mixture, poured into place and allowed to harden and dry.


How long did it take for the concrete to dry?

is a scinentific method


How long does salt dough take to harden?

Salt dough typically takes 24-48 hours to fully harden, depending on the thickness of the dough and the humidity in the environment.


What temperature does concrete need to be to harden?

all things that need to dry are based on 72 degrees concrete needs 30 days to fully cure.


What is hydration of concrete?

Hydration of concrete is a chemical reaction that occurs between cement and water, resulting in the formation of bonds between cement particles and aggregates. This process is essential for the concrete to harden and develop its strength and durability over time. Proper hydration is crucial for achieving desired concrete properties and ensuring long-term performance.


How long does a concrete driveway take to dry completely?

A concrete driveway typically takes about 7 days to dry completely.