answersLogoWhite

0

It depends on the humidity, warmth, and other factors such as air movement and brand of sealer.

It'll be tough enough to walk on with sock feet in 24-48 hours. Most typical cure to maximum hardness are 3-5 days with constant air movement.

Only a pro can tell you for sure.

User Avatar

Wiki User

17y ago

What else can I help you with?

Related Questions

How long should a concrete garage floor cure before applying epoxy coating?

If you're dealing with a new slab, you must wait a minimum of 28 days, preferably two months, for the floor to cure and dry thoroughly before applying a garage floor coating.


How long does it take for polyurethane to cure completely?

Polyurethane typically takes about 24-48 hours to cure completely.


How long does it take for polyurethane to cure on a table?

Polyurethane typically takes 24-48 hours to cure on a table.


How long does it take for polyurethane to fully cure?

Polyurethane typically takes about 24 to 48 hours to fully cure.


How long does polyurethane take to cure completely?

Polyurethane typically takes about 24-48 hours to cure completely.


What is the recommended cure time for polyurethane after application?

The recommended cure time for polyurethane after application is typically 24 to 48 hours.


How long does it typically take for polyurethane to cure completely?

Polyurethane typically takes about 24 to 48 hours to cure completely.


What is the cure time for Varathane water-based polyurethane?

The cure time for Varathane water-based polyurethane is typically 24 hours.


What is the recommended cure time for water-based polyurethane?

The recommended cure time for water-based polyurethane is typically 24 hours.


How long does oil-based polyurethane take to cure completely?

Oil-based polyurethane typically takes about 30 days to cure completely.


How long does poly take to cure and what factors can affect the curing time?

The curing time for polyurethane can vary depending on factors such as temperature, humidity, and thickness of the coating. Generally, polyurethane can take anywhere from 24 hours to several days to fully cure. Factors that can affect curing time include proper ventilation, application method, and environmental conditions.


What is the recommended cure time for water-based polyurethane on wood surfaces?

The recommended cure time for water-based polyurethane on wood surfaces is typically 24 hours.