answersLogoWhite

0

Imediatly after trowling

User Avatar

Wiki User

12y ago

What else can I help you with?

Continue Learning about Engineering

How long must concrete dry before it rains on it?

First of all, concrete does not "dry" to become hard. It cures, which is a chemical interaction between its water and its portland cement. Usually, a couple of hours is plenty of time for concrete to 'set' enough to not be damaged by rain. The best and strongest concrete never dries out for the first 28 days from pouring it.


How dry must concrete be before laying wood flooring?

it has to be tacky!!!!!!!


How long must concrete cure before staining it?

Concrete should ideally cure for at least 28 days before staining. This allows the concrete to achieve its maximum strength and ensures that moisture levels are low enough for proper adhesion of the stain. However, some stains may be applied sooner, typically after 7 days, depending on the specific product and conditions, so it's important to follow the manufacturer's recommendations. Always conduct a moisture test to confirm readiness before staining.


What must be the slump value for different grade of concrete?

what is the slump value for M20 concrete


How dry must the ground be before pouring concrete?

Before pouring concrete, the ground should be sufficiently dry to prevent excess moisture from affecting the curing process. Ideally, the soil moisture content should be below 10%, and any standing water or muddy conditions should be avoided. This ensures proper adhesion and reduces the risk of cracking or weakening the concrete. Always check local guidelines and conditions, as they may vary.

Related Questions

How long must concrete dry before it rains on it?

First of all, concrete does not "dry" to become hard. It cures, which is a chemical interaction between its water and its portland cement. Usually, a couple of hours is plenty of time for concrete to 'set' enough to not be damaged by rain. The best and strongest concrete never dries out for the first 28 days from pouring it.


How dry must concrete be before laying wood flooring?

it has to be tacky!!!!!!!


How long must a Canadian be in Mexico before you can be married?

How long must you be in Mexico before you can be married?:


How do i do the preparation on new comcrete before tiling it?

The concrete preparation must be seen to carefully before laying tile. The initial surface must be very clean and the cement laid out as smoothly as possible prior to tiling.


How long must concrete cure before staining it?

Concrete should ideally cure for at least 28 days before staining. This allows the concrete to achieve its maximum strength and ensures that moisture levels are low enough for proper adhesion of the stain. However, some stains may be applied sooner, typically after 7 days, depending on the specific product and conditions, so it's important to follow the manufacturer's recommendations. Always conduct a moisture test to confirm readiness before staining.


How long should a concrete garage floor cure before applying epoxy coating?

If you're dealing with a new slab, you must wait a minimum of 28 days, preferably two months, for the floor to cure and dry thoroughly before applying a garage floor coating.


How long must you be a cosmetologists before you can retire?

93


How to write expository writing?

You must do it in this order: Concrete Detail, Concrete Detail, Commentary.


What must be the slump value for different grade of concrete?

what is the slump value for M20 concrete


How long must passed team wait before remain behind before demanding the trail?

No


How long must an egg be in vinegar before the shell is dissolved?

it takes about ten days before it dissloves


Can green drywall be cemented to concrete?

No, it must be screwed. - But there are many varieties of excellent concrete board now. -