answersLogoWhite

0

Typically, it's recommended to leave footing for at least 7 to 14 days before building on it. This allows the concrete to cure adequately, achieving sufficient strength to support the structure. However, the exact time may vary depending on weather conditions, the type of concrete used, and specific project requirements. Always consult local building codes and guidelines for the best practices in your area.

User Avatar

AnswerBot

3w ago

What else can I help you with?

Related Questions

How long does it take to get a fossil resurrected in Pokemon fire red?

Just leave the building then come back in and he will be done. Just leave the building then come back in and he will be done.


What is the importance of including a footing drain detail in a construction project?

Including a footing drain detail in a construction project is important because it helps to prevent water from accumulating around the foundation of a building. This can help to prevent water damage, mold growth, and structural issues in the long run. The footing drain helps to redirect water away from the foundation, ensuring the stability and longevity of the structure.


What is difference between combined footing and raft foundation?

A Combined footing is a long footing supporting two or more columns in one row. While a Mat or Raft foundation is a large footing, usually supporting several columns in two or more rows.


How long can you leave an empty glass in a freezer to chill the glass before use?

It depends on hw long you want to leave it in the freezer, you could leave it there forever. But if you want to know how long you should chill the glass before it gets cold before using it then I don't know.


How long should one wait before putting blocks on a strip footing?

Typically, one should wait at least 7 days before placing blocks on a strip footing to allow the concrete to cure adequately and reach sufficient strength. However, this duration can vary based on factors such as the ambient temperature, humidity, and the specific concrete mix used. It's essential to ensure that the concrete has reached a minimum compressive strength of around 70% before proceeding. Always consult local building codes and practices for specific requirements.


How long before baby pigeons leave the nest?

Early baby pigeons leave after about a month.


How long before blackbirds leave the nest?

1 year


How long is it before giraffes leave their mothers?

two years


How long can someone leave furniture before it becomes abandoned?

To tell you the truth the second you leave it is is abandomed


How long can a tourist stay in the USA before they are required to leave?

A tourist can typically stay in the USA for up to 90 days before they are required to leave.


How long can you leave your car on roadside?

you can leave your car on the road side before eleven or though you'll get a ticket.


How long can Americans stay in Japan before they are required to leave?

Americans can stay in Japan for up to 90 days without a visa before they are required to leave.