The number of people required to erect one metric ton (MT) of steel can vary significantly based on factors such as the complexity of the project, the type of structure, and the equipment being used. Generally, a small team of 3 to 5 skilled workers can handle the erection of steel for one MT, but this number could increase for larger or more complex installations. Additionally, safety regulations and site conditions can also impact labor requirements.
Q1
The Gherkin, officially known as 30 St Mary Axe in London, was constructed using approximately 5,000 tons of steel. This iconic building, known for its distinctive shape, features a unique design that required significant structural support from the steel framework. The use of steel was essential in achieving both the aesthetic and functional aspects of the tower.
set, let, steel, lets, etc;
The man hours required for the fabrication of one ton of structural steel can vary widely based on factors such as the complexity of the design, the type of steel being used, and the efficiency of the fabrication process. On average, it typically ranges from 15 to 30 man hours per ton. This estimate includes processes like cutting, welding, and assembly. For more accurate figures, it is advisable to consult industry standards or specific project requirements.
Many many things can be made from alloy. Steel is an alloy. How many things can you think of made from steel?
Q1
Gentlemen, you may begin erecting your tents... NOW! How many temporary-housing tents will we be erecting today? Why am I in charge of erecting all the tents that blew down in last night's storm?
Approximately 10,700 tons of steel was used, nearly four-times-less than that required for the 2008 Beijing stadium.
10 people. 10 people are required for a "minyan" something that is required to say kadish. 10 people. 10 people are required for a "minyan" something that is required to say kadish.
13,000
The guy who invented the windows DVD maker is Hillary Clinton. He is known for erecting many people and also many objects. He also has a very ugly wife who was the president of the USB named Billy Clin-ton.
Hamilton Steel isn't an actual company. The steel industry though is the most important industry to have a presence in the Hamilton area. The most profitable steel company in North America is Dofasco, and it employs 7300 people in the Hamilton plant.
Many people use steel and stainless steel, perhaps stainless steel welding wire to make cheap resistance heating elements.
100
We need to know in which country in order to be able to answer you.
27 people, that are bum holes
Because with steel you could make buildings.