18.6765 cubic blathinetres is one brass
How much cement sand and stone do you need for 1 cubic meter of concre
Type your answer here... 11.2
1:6 brick work sand consumption for 1 cubic meter = 9.71 cft 1 cubic meter brick work cement consumption = 1.32 bags 1.32/28.8= .0458 cubic meter .458*6 = .275 .275*35.31 =9.71 cft
1 cubic foot=100 lbs of sand 1728 cubic in.=100 lbs of sand 864 cubic in.= 50 lbs of sand 432 cubic in.= 25 lbs of sand and so on and so on
To make 1 cubic meter of concrete, you typically need about 1.5 cubic meters of sand and gravel combined. The general ratio for mixing concrete is 1 part cement, 2 parts sand, and 3 parts gravel. Therefore, for 1 cubic meter of concrete, you would need 0.5 cubic meters of cement, 0.75 cubic meters of sand, and 0.75 cubic meters of gravel.
How much cement sand and stone do you need for 1 cubic meter of concre
100 Cubic feet of sand is one brass a Truck load is about 2.5 Brass of sand Brass is old unit, generally used in construction in India
1 cm cubed or 1cm3
100
The weight varies; but if it's dry sand, the cubic meter will weigh around 1500 kilos.
The weight of sand per cubic meter can vary depending on the density of the sand. Generally, the density of sand is around 1,600 kg/m3 to 1,900 kg/m3. This means that for a cubic meter of sand, the weight can range from 1,600 kg to 1,900 kg.
The word "brass" refers to a measure of quantity for loose material (like sand, metal, etc). This term is common in India. One brass equals one hundred cubic feet volume. Calculate the volume of sand and divide by 100 cubic feet to get the number of brass units.
3 cubic meter
3
Concrete is a mixture of cement, sand, stone, and water. In a cuibic meter of concrete, , there is about 0.3 cubic meters of sand, or about 475 kg
With dry sand. 1.602 tonnes
Type your answer here... 11.2