answersLogoWhite

0

What else can I help you with?

Related Questions

How much diesel consume in one hour of cat 320 excavator?

18 liters aprox


How much fuel the caterpillar track escavator 320 BL consume per hour?

On average a Caterpillar Track Excavator 320 BL will consume about 10 gallons of fuel per hour. On an average eight hour workday, it will consume 80 gallons of fuel.


What is the hourly fuel consumption of a 320 cat excavator?

We ran a Rental Cat 320 for 7 hours and averaged 6 gallons per hour consumption.


What is the best excavator?

Cat 320 d


How many gallons of fuel does a 320 CAT excavator hold?

A Caterpillar 345 Excavator will burn fuel at a varying rates depending on the level of work. However, on average, the machine burns about seven gallons per hour.


What oil do you use in the final drive track motor of your bobcat 320 mini excavator?

A 320 is a skid steer loader and uses bobcat # 7003026 oil kit. Drain and refill is recommended every time the track is removed but listed on the 1000 hour service.


What is 320 km per hour in miles?

320 km per hour equals 198.83 miles per hour.


How fast is 320 kilometers per hour in miles per hour?

320 km/h = about 198.84 mph


What is 320 kilometers per hour in mph?

320 kph = 198.84 mph


How long is 320 hours in a 6 hour day?

To find out how many 6-hour days are in 320 hours, divide 320 by 6. This calculation gives you approximately 53.33 days. Therefore, 320 hours is equivalent to 53 full 6-hour days and a fraction of a day.


How much dirt needed to fill a box 10 ft by 4 ft by 8 inches?

find the area of it 320 feet squared


What is the difference between excavator 330 and excavator 320?

The main difference between the excavator models 330 and 320 typically lies in their size, power, and performance capabilities. The 330 is generally larger and has a higher operating weight, allowing it to handle heavier loads and perform more demanding tasks. Additionally, the 330 often features a more powerful engine and improved hydraulics, resulting in better efficiency and productivity. In contrast, the 320 is more compact, making it suitable for tighter job sites while still offering solid performance for various excavation tasks.