1 cubic yard = 0.79 M cube.
depending on application i.e. foundations single storey or double storey, drive way etc. and location and delivery time you look at spending £160 in the UK.
There are lots of different variables so speak to your local supplier.
One yard of delivered concrete costs $250 dollars. This is true if using a ready mix truck. A yard of concrete weighs approximately 4200 pounds. The price varies according to where you live and the grade of concrete.
There are approximately 27 cubic feet in a cubic yard, and an 80-pound bag of concrete typically yields about 0.6 cubic feet. Therefore, to fill one cubic yard, you would need about 45 bags of 80-pound concrete.
According to the related link below; the required amount to cover 1 square yard with 4 inches of concrete is 6.6 60 pounds bags.
One cubic yard of concrete typically weighs about 4,000 pounds. Since each 80-pound bag of concrete contains approximately 0.6 cubic feet, you would need about 45 bags to equal one cubic yard of concrete. Specifically, 1 cubic yard equals 27 cubic feet, so dividing 27 by 0.6 gives you around 45 bags.
Most bags will make a 1/3 of a cubic foot of concrete.
One yard of delivered concrete costs $250 dollars. This is true if using a ready mix truck. A yard of concrete weighs approximately 4200 pounds. The price varies according to where you live and the grade of concrete.
27 cubic feet in one yard of concrete. $90.00 divided by 27cu.yds= $3.33/cu.ft.
The yard is a unit of length, not a unit for mass !!
One yard of delivered concrete is $250.00. Prices change according to location. One cubic yard contains 27 cubic feet. Concrete is sold in cubic yards. A yard of concrete weighs approximately 4200 pounds.
The price of one yard of concrete is $75.00 a cubic yard.
How much does one yard of cedar mulch costs.
How much does one yard of cedar mulch costs.
One cubic yard of concrete typically weighs around 4,000 pounds, although this can vary slightly depending on the specific mix and materials used. Generally, the weight can range from 3,600 to 4,800 pounds. This weight is important to consider for transportation and structural support calculations.
When you purchase concrete you will pay by volume per cubic yard (commonly called "yard"), since a linear yard is 3 feet there are 27 cubic feet in one cubic yard. According to www.doityourself.com a yard of concrete will cost about $75.00 so a cubic foot will cost you $75/27, which would be about $2.78 per cubic foot. 1 foot of concrete is a very small volume so you will probably be charged for a minimum quantity which will be more that the cost of 1 foot. Keep the difference between line, area and volume in mind. If you need less that 10 cubic feet of concrete I would suggest you get a bag of mix from your local hardware store and follow the directions on the bag. You will need a shovel and a bucket or wheel barrel. (a 5 gallon bucket is a little over half a cubic foot) If you are thinking about mixing the concrete yourself, its a good bet to just go to home depot or lowes and write down the cost of various sizes of concrete bags. Once you have that you can enter it into a concrete cost per cubic yard tool (such as: http://righterscientifics.com/concrete-cost-per-yard.html) and figure out the total cost of your project.
42.46 per square yard.
A new one will cost plenty. The best place to get one is at your local auto salvage yard. There you will pay about 50% of what a new one will cost. The price will vary of course from yard to yard.
$19.50