How much cement sand and stone do you need for 1 cubic meter of concre
1 and half tons
400kg
To make 1 cubic meter of concrete, you typically need about 1.5 cubic meters of sand and gravel combined. The general ratio for mixing concrete is 1 part cement, 2 parts sand, and 3 parts gravel. Therefore, for 1 cubic meter of concrete, you would need 0.5 cubic meters of cement, 0.75 cubic meters of sand, and 0.75 cubic meters of gravel.
2000 to 2500 Kg/cubic meter depending upon the grade of concrete
The average cubic meter of pea gravel weighs 1788 kilograms. A cubic meter weighs approximately 1.79 tonnes, and a square meters only weighs 17.88 kilograms or 9.3 pounds.
One cubic meter of concrete has 1,000 liters. Therefore, 0.1 cubic meters of concrete would be 100 liters. This can also be expressed as 100,000 cubic centimeters.
compare 0.76 cubic meter to kilogram
1.3 ton
12L
1%
An 80 pound bag of premix concrete will make .6 cubic feet of cured concrete. There are 27 cubic feet in a cubic meter, so it would take 45 80 pound bags to make one cubic meter.
How much cement sand and stone do you need for 1 cubic meter of concre
1 and half tons
400kg
To make 1 cubic meter of concrete, you typically need about 1.5 cubic meters of sand and gravel combined. The general ratio for mixing concrete is 1 part cement, 2 parts sand, and 3 parts gravel. Therefore, for 1 cubic meter of concrete, you would need 0.5 cubic meters of cement, 0.75 cubic meters of sand, and 0.75 cubic meters of gravel.
The cost of a square meter of concrete can vary depending on factors such as the type of concrete mix, local market conditions, and any additional labor or delivery costs. On average, the price can range from $75 to $150 per square meter. It is recommended to obtain quotes from local suppliers for an accurate estimate.