That depends on the thickness of the cement, the strength of the cement, the age of it, Is it reinforced
well concrete mix is a 1/3 gravel , 1/3 sand and 1/3 portland cement . I hope this helps.
During concreting first of all we have to take an adequate quantity of aggregate,sand,cement& water according to standard mix design.Then prepare a proper mix which is nothing but concrete
800 C feet
To determine how many shovels one 25 kg bag of cement can hold, we first need to know the volume of a shovel. Let's assume a typical shovel can hold around 0.01 cubic meters of cement. Next, we need to convert the weight of the cement to volume using its density, which is around 1440 kg/m^3 for cement. This means a 25 kg bag of cement is approximately 0.017 cubic meters. Dividing this volume by the volume of one shovel gives us around 1.7 shovels per bag of cement.
6 Bags of masons lime
how much space does 25kg of garnet take up
It would take 676 cubic feet of cement for a patio of that size.
You will need 3.7 cubic yards of cement.
This is a volume calculation. I assume the dimension for the "6" is inches? If so, the volume= 20x20x0.5= 200 cubic ft.= 7.4 cubic yards
A standard 5-gallon bucket has a volume of about 0.67 cubic feet or approximately 0.19 cubic meters. Given that sand has a density of around 100 pounds per cubic foot, it would take roughly 67 pounds of sand to fill the bucket. However, the exact amount can vary based on the type of sand and its moisture content.
It would take 135 cubic feet = 5 cubic yards.
18
If you mean 2 inches, convert that to feet. Then multiply the area by the height. The answer will be the volume of the sand, in cubic feet.
That would take 250 cubic meters of sand to fill as 10*5*5 is 250.
That depends on the thickness of the cement, the strength of the cement, the age of it, Is it reinforced
18.52 cubic yards are needed.