To cast 41 cubic yards of concrete, you typically use a mix ratio of 1 part cement, 2 parts sand, and 3 parts gravel (aggregate). For 41 yards of concrete, you'll need approximately 6.8 cubic yards of cement, 13.6 cubic yards of sand, and 20.4 cubic yards of gravel. Adjust the mix based on specific project requirements or concrete strength needed. Always consider adding water based on the moisture content of the materials and desired workability.

User Avatar

AnswerBot

2mo ago

What else can I help you with?

Related Questions

What is the difference between concrete and dry cast stone?

Concrete Is made out Of Clay..Dry Cast Stone..Is made Out Of Stone.. ;D


Full form of PCC in architecture?

Pcc = portland cement concrete or pre cast concrete


What is stronger concrete or cement?

Concrete is stronger than cement.It is composed of aggregates (sand and gravel) and cement; and may be cast with reinforcing bar within it (reinforced concrete). Cement is only a part of concrete. Cement has no tensile strength while concrete has compressive and tensile strength.


How are sewers built?

Clay pipe, Bricks, Asbestos cement, Cast Iron various schedules , preformed pipe and concrete forms (ducts)


What is a Parge coat?

A thin coat of fine cement that is applied to the exterior of cast concrete that smoothes out the voids and imperfections and evens out the finish and color.


What has the author F Burren written?

F. Burren has written: 'Moulds for cast stone and concrete products'


What types of items could be created using a cast stone?

Cast stone, also known as a refined architectural concrete building unit is manufactured to simulate natural cut stone. These stones are used in unit masonry applications./


Why the precast girders are used instead of reinforced cement concrete girders?

becos precast girders are not cast in -site and therefore faster. they also available in standard size.


What is the intial setting time for cement?

The initial setting time of cement is 30 minutesThe final setting time of the cement is 10 hours.The initial and final setting time of the cement can be found by using the Vicat's apparatus.


What has the author Francis Howard Fielder written?

Francis Howard Fielder has written: 'Estimating and costing precast concrete products and cast stone'


What are Advantage pre cast concrete slab than insitu concrete?

What are Advantage pre cast concrete slab than insitu concrete?


What is concrete pump?

Concrete Pump is an equipment mounted on a Truck Chasis, which does the job of Mixing the cement Mortar and delivering the same at work site as ready Mix concrete. Since the mortar mix can directly be poured or pumped to cast the slab or column or any other structural component, it is termed as Concrete Pump please visit the URL : - http://www.concretepumps.com for further reference.