mg= mass * gravity = 110 * 9.8 =1078
W=mg*height=1078*12m=12,963 J
what geogaphical features are needed when building a hydroelectric dam
No college is needed to become a construction worker. All you need is to get on crew and a few tools.
no, because it is no airplane nor vehicle.
It takes 2L of water to make 1 kg of concrete. That is approximately 4800L per cubic meter.
To calculate the amount of sand and cement needed for 2000 bricks, you first need to determine the volume of one brick. Assuming a standard brick size of 8 inches by 4 inches by 2 inches, the volume of one brick is 64 cubic inches. For 2000 bricks, the total volume would be 128,000 cubic inches. To convert this volume to cubic feet (since sand and cement are typically measured in cubic feet), you would divide by 1728 (12x12x12). This gives you approximately 74.07 cubic feet of sand and cement needed for 2000 bricks.
The number of bricks needed to complete a building made of bricks depends on the size and design of the building. However, it typically takes thousands to millions of bricks to construct a building, with smaller buildings requiring fewer bricks and larger buildings requiring more.
A bill of material - is simply a list of items needed to complete the construction of something. For example - for building a house it would list things like timber, bricks, roofing slates, glass, doors, mortar, sand etc... It would show what materials are needed, the quantities and price.
Reinforced bricks are commonly used in building construction for structural elements such as load-bearing walls, columns, and foundations. The reinforcement adds strength and helps withstand stress, making them ideal for supporting structural loads in buildings. They are especially useful in seismic areas where extra strength and durability are needed.
depends on how big the bricks are
A standard ground rod is 5/8 x 10'. The amount of rods needed is governed by the electrical code. The largest type of grounding system is a Ufer ground. This is where the bare grounding conductor is embedded in the footings of the building and the weight of the building presses the ground wire to the earths surface. These types of grounds are used mostly in construction and are requested by electrical engineers.
well they got more trade and things they needed so they got it :)
Yes. I am forty years old. There are forty tons of bricks needed to build this office building.
To effectively plan and execute the construction of a garden wall, follow these steps: Determine the purpose and design of the wall. Measure the area and calculate the materials needed. Obtain necessary permits and permissions. Prepare the site by clearing the area and leveling the ground. Lay a solid foundation using concrete or gravel. Start building the wall, layer by layer, using bricks or stones and mortar. Ensure the wall is level and sturdy as you build. Finish the wall with a cap or coping to provide a finished look. Maintain the wall by checking for any damage and making repairs as needed.
If the bricks are in feet then 51/2 bricks would be needed.
They needed structure and rules so that they can be organized
Site induction is the actual plan of the site whey by the engineer list everything needed during the construction of a building
A building permit may be needed for adding a deck or patio in Edmonds, Washington. The type of permit and codes depends on the height, location and construction of the deck.