answersLogoWhite

0

every 2 years, the cables are changed.

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

When was the first cable bridge built?

The first cable-stayed bridge, which is often considered a precursor to modern cable bridges, was built in 1784 in Germany. However, the first true suspension bridge, which utilized cables to support the deck, was completed in 1820 in Scotland, known as the Menai Suspension Bridge. This type of bridge design has since evolved, leading to the construction of many iconic cable-stayed and suspension bridges around the world.


Is the clifton bridge the first suspension bridge ever built?

No, the Clifton Suspension Bridge is not the first suspension bridge ever built. It was designed by Isambard Kingdom Brunel and completed in 1864, but earlier examples of suspension bridges date back to ancient times, such as the Inca rope bridges in South America and various timber suspension bridges in Asia. The first modern suspension bridge is often considered to be the Menai Suspension Bridge, completed in 1826.


What is the purpose of cable-stayed bridge?

The purpose of a cable-stayed bridge is to support the bridge deck using cables that are anchored to one or more vertical masts or towers. This design allows for efficient weight distribution and stability, enabling the bridge to span longer distances without the need for numerous piers. Cable-stayed bridges are often chosen for their aesthetic appeal and cost-effectiveness compared to other bridge types, such as suspension bridges. They are commonly used in both road and rail applications.


What is the definition of cable bridge?

A cable bridge, often referred to as a cable-stayed bridge, is a type of bridge where the deck is supported by cables that are anchored to one or more towers. These cables transfer the load from the bridge deck to the towers, allowing for longer spans and a more streamlined design. The design can provide aesthetic appeal and structural efficiency, making it a popular choice for modern bridge construction.


What is difference between bridge pier pylon abutment?

A bridge pier is a vertical structure that supports the bridge's superstructure and transfers loads to the foundation, typically found between spans. A pylon is a taller, often decorative structure used to support cables in cable-stayed or suspension bridges, providing both structural support and aesthetic appeal. An abutment is located at the ends of a bridge, supporting the ends of the bridge span and connecting it to the ground or earth embankment, resisting horizontal forces and stabilizing the structure.


What do people use for bridge demolition?

Bridge demolition would be used to demolish a bridge due to it being unsafe or if it were to be replaced with a better built bridge. Often bridges become unsafe in which case it would have to be demolished and rebuilt.


How often should ball joints be replaced?

Ball joints should be replaced anywhere between 70,000 to 150,000 miles. Ball joints connect the wheel to the car's suspension system.


How much did it cost to build the tatara bridge?

The Akashi Kaikyō Bridge, commonly known as the Pearl Bridge, is often confused with the Tatara Bridge. The Tatara Bridge, which connects Shikoku and Honshu in Japan, was completed in 1999 and cost approximately 4.8 billion USD. It is one of the longest suspension bridges in the world and a significant engineering achievement.


Why is the tower bridge suspension?

Advantages over other bridge typesLonger main spans are achievable than with any other type of bridgeLess material may be required than other bridge types, even at spans they can achieve, leading to a reduced construction costExcept for installation of the initial temporary cables, little or no access from below is required during construction, for example allowing a waterway to remain open while the bridge is built aboveMay be better to withstand earthquake movements than heavier and more rigid bridges


Which present day bridge was the site ever across the Thames in London?

London Bridge is the oldest, a bridge has been on or near the present site since Roman times. The actual bridge of course has been replaced a number of times the last in 1973. Others have included two Roman bridges, a Saxon Bridge, a Norman bridge, a medieval bridge and a 19th century bridge before the present one. The current London Bridge is often confused with Tower Bridge by tourists.


Is the London bridge a cantilever bridge?

No. London Bridge is a box girder concrete bridge and has never been a cantilever bridge. You may be thinking about Tower Btidge - which people sometimes confuse with London Bridge. Tower Bridge is a combined suspension and bascule bridge.


How often must the suspension ropes for a suspension scaffold be inspected?

Every day

Trending Questions
What is the best way to keep something warm in the ice chest? What are the shortcomings of HTML? What is the file htm used for? Why when you turn on the hot water in the shower no water comes out at all the cold works fine but there is no water or pressure on the hot side? What involves creating representations of complex objects or processes? What is the difference between a half and a full section engineering? What does el impermeable mean? What temperature does wax melt? What is concrete class in java? Difference between top and bottom steel in beam? The symbol that represents a logical OR in Java C plus plus and C? Discuss why the damper winding are not used in turbo generator? Can the operand expression in an ORIGIN statement contain forward references if so outline the statement can be processed in a two pass-assembler scheme? Why is it important to sterilize the handle of the loop? What common genetic variation which causes a change in the amino acid sequence in the structure of hemoglobin leads to what disease? Write a program in 8086 assembly language that accept a string from the keyboard and then reverses a string using stack The string can be assumed to be available in the data segment The results are? How do you import such classes if the classes are needed to be imported first before it can be used in program? You want to look at the RID allocation table for a DC What do you do? What gcse do you need to become a civil engineer? What are the methods to improve the surge impedance loading of transmission lines?