answersLogoWhite

0

A blast furnace typically stands between 70 to 100 feet tall, with some reaching heights of up to 150 feet. The height of a blast furnace is crucial for its efficiency in producing iron, as it allows for the proper distribution of materials and gases throughout the furnace. The tall structure also helps create the necessary conditions for the chemical reactions that take place within the furnace to produce molten iron.

User Avatar

ProfBot

6mo ago

What else can I help you with?

Related Questions

What is the German word for blast furnace?

Blast furnace = Hochofen


What is Blast Furnace?

A blast furnace is used to extract iron from its ore.


Why blast furnace called as blast furnace?

Its because air is forced into the furnace to increase temperature. Steve.


When was Govăjdia Blast Furnace created?

Govăjdia Blast Furnace was created in 1810.


Where is the largest blast furnace in the world and how big is it?

As of mid-2012 the largest blast furnace in Europe was the one at Duisberg, Germany, which is said to be about 90 metres tall. Please see the link.


What Is A Blast Furnace?

A blast furnace is a forge in which ore is smelted to meal, being intensified by a blast of hot air.


How does limestone coke and iron ore get into the blast furnace?

through the top of the blast furnace


Where is the Largest blast furnace of Asia?

'i' blast furnace of tata steel, jamshedpur,india


What do you all a furnace in a factory?

A blast furnace.


How is slag collected from a blast furnace?

iron is collected from blast furnace by drilling the taphole.Taphole is a hole drill and plug after cycle of time located in blast furnace bottom.


What is the volume of a blast furnace?

Useful Volume of Blast Furnace is the volume of the furnace from the throat level to the level where the taphole is placed. This is known the way basically because that is the region where the useful products from Blast furnace are present.


Is blast furnace a batch furnace?

A blast furnace runs continuously, and input materials are continually dumped in at the top to make their way down through the furnace. Shutting down a blast furnace for relining or other work is a major event in its life.